Vai al contenuto

Gondola · Plan de Corones · Trentino Alto Adige

Cianross

Cianross (gondola) serves Plan de Corones, Trentino Alto Adige. The line measures 305 m and covers 94 m of vertical drop. The base station is at 1,202 m. The top station is at 1,296 m. The ride takes about 1.3 minutes. Declared capacity is 1,200 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
305 m
Vertical drop
94 m
Top station
1,296 m
Hourly capacity
1,200 p/h

Photos

User:Mateus2019CC BY 3.0 de · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,202 mTop station1,296 m305 m94 m31%

Length 305 m · Vertical drop 94 m · Average gradient 31%

Gondola Cianross, Base station 1,202 m, Top station 1,296 m, Length 305 m, Vertical drop 94 m, Average gradient 31%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
305 m
Vertical drop
94 m
Base station
1,202 m
Top station
1,296 m
Average gradient
31%
Hourly capacity
1,200 p/h
Seats per vehicle
8
Ride time
1.3 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Plan de Corones

  • Sonne Chairlift · 2,272 m
  • Belvedere Gondola · 2,272 m
  • Ruis Gondola · 2,264 m
  • Olang II Gondola · 2,262 m
  • Plateau Chairlift · 2,262 m
  • Kronplatz 2000 Gondola · 2,256 m
  • Kronplatz II Gondola · 2,256 m
  • Gipfelbahn Gondola · 2,250 m

All lifts in Plan de Corones →

Frequently asked questions

How long is Cianross?

The line measures 305 m along the route mapped in OpenStreetMap, with 94 m of vertical drop.

How long is the ride on Cianross?

The ride takes about 1.3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Cianross cover?

Cianross covers 94 m of vertical drop, from 1,202 m to 1,296 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Cianross carry?

Declared capacity is 1,200 people per hour, with 8 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Cianross open?

Opening times follow the lift calendar of Plan de Corones: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Cianross and how do you get there?

The base station is in Plan de Corones, Trentino Alto Adige, at 1,202 m. The map on this page shows the starting point and the route up to 1,296 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.