Vai al contenuto

Gondola · Plan de Corones · Trentino Alto Adige

Col Toron

Col Toron (gondola) serves Plan de Corones, Trentino Alto Adige. The line measures 1,365 m and covers 315 m of vertical drop. The base station is at 1,475 m. The top station is at 1,790 m. The ride takes about 5 minutes. Declared capacity is 2,600 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,365 m
Vertical drop
315 m
Top station
1,790 m
Hourly capacity
2,600 p/h

Technical data

Base station1,475 mTop station1,790 m1,365 m315 m23%

Length 1,365 m · Vertical drop 315 m · Average gradient 23%

Gondola Col Toron, Base station 1,475 m, Top station 1,790 m, Length 1,365 m, Vertical drop 315 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
1,365 m
Vertical drop
315 m
Base station
1,475 m
Top station
1,790 m
Average gradient
23%
Hourly capacity
2,600 p/h
Seats per vehicle
9
Ride time
5 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Plan de Corones

  • Sonne Chairlift · 2,272 m
  • Belvedere Gondola · 2,272 m
  • Ruis Gondola · 2,264 m
  • Olang II Gondola · 2,262 m
  • Plateau Chairlift · 2,262 m
  • Kronplatz 2000 Gondola · 2,256 m
  • Kronplatz II Gondola · 2,256 m
  • Gipfelbahn Gondola · 2,250 m

All lifts in Plan de Corones →

Frequently asked questions

How long is Col Toron?

The line measures 1,365 m along the route mapped in OpenStreetMap, with 315 m of vertical drop.

How long is the ride on Col Toron?

The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Col Toron cover?

Col Toron covers 315 m of vertical drop, from 1,475 m to 1,790 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Col Toron carry?

Declared capacity is 2,600 people per hour, with 9 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Col Toron open?

Opening times follow the lift calendar of Plan de Corones: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Col Toron and how do you get there?

The base station is in Plan de Corones, Trentino Alto Adige, at 1,475 m. The map on this page shows the starting point and the route up to 1,790 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.