Dantercepies II (gondola) serves Val Gardena, Trentino Alto Adige. The line measures 530 m and covers 142 m of vertical drop. The base station is at 2,140 m. The top station is at 2,282 m. The ride takes about 1.63 minutes. Declared capacity is 3,000 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 530 m
- Vertical drop
- 142 m
- Top station
- 2,282 m
- Hourly capacity
- 3,000 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 530 m · Vertical drop 142 m · Average gradient 27%
Gondola Dantercepies II, Base station 2,140 m, Top station 2,282 m, Length 530 m, Vertical drop 142 m, Average gradient 27%.
- Lift type
- Gondola
- Length
- 530 m
- Vertical drop
- 142 m
- Base station
- 2,140 m
- Top station
- 2,282 m
- Average gradient
- 27%
- Hourly capacity
- 3,000 p/h
- Seats per vehicle
- 10
- Ride time
- 1.63 min
- Heated seats
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Val Gardena
- Cabinovia Forcella del Sassolungo Gondola · 2,737 m
- Fermeda Chairlift · 2,497 m
- Catores Chairlift · 2,477 m
- Furnes - Seceda Cable car · 2,433 m
- Col Rodella Gondola · 2,392 m
- Norei - 5 Dita Chairlift · 2,388 m
- Sasso Levante Chairlift · 2,387 m
- Salei Chairlift · 2,382 m
Frequently asked questions
How long is Dantercepies II?
The line measures 530 m along the route mapped in OpenStreetMap, with 142 m of vertical drop.
How long is the ride on Dantercepies II?
The ride takes about 1.63 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Dantercepies II cover?
Dantercepies II covers 142 m of vertical drop, from 2,140 m to 2,282 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Dantercepies II carry?
Declared capacity is 3,000 people per hour, with 10 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Dantercepies II open?
Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Dantercepies II and how do you get there?
The base station is in Val Gardena, Trentino Alto Adige, at 2,140 m. The map on this page shows the starting point and the route up to 2,282 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.