Vai al contenuto

Gondola · Corno del Renon · Trentino Alto Adige

Funivia del Corno del Renon

Funivia del Corno del Renon (gondola) serves Corno del Renon, Trentino Alto Adige. The line measures 2,190 m and covers 532 m of vertical drop. The valley station is at 1,534 m. The top station is at 2,066 m. The ride takes about 7 minutes. Declared capacity is 1,800 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
2,190 m
Vertical drop
532 m
Top station
2,066 m
Hourly capacity
1,800 p/h

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We do not yet have a checked official calendar for Corno del Renon. Dates and hours are on the official site.

This is not live status: check the official site before you go up.

Technical data

Valley station1,534 mTop station2,066 m2,190 m532 m24%

Length 2,190 m · Vertical drop 532 m · Average gradient 24%

Gondola Funivia del Corno del Renon, Valley station 1,534 m, Top station 2,066 m, Length 2,190 m, Vertical drop 532 m, Average gradient 24%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
2,190 m
Vertical drop
532 m
Valley station
1,534 m
Top station
2,066 m
Average gradient
24%
Hourly capacity
1,800 p/h
Seats per vehicle
8
Ride time
7 min
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Corno del Renon

  • Rittnerhorn - Corno del Renon Drag lift · 2,234 m
  • Pennleger Drag lift · 2,036 m
  • Unnamed lift Magic carpet · 1,908 m

All lifts in Corno del Renon →

Frequently asked questions

How long is Funivia del Corno del Renon?

The line measures 2,190 m along the route mapped in OpenStreetMap, with 532 m of vertical drop.

How long is the ride on Funivia del Corno del Renon?

The ride takes about 7 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Funivia del Corno del Renon cover?

Funivia del Corno del Renon covers 532 m of vertical drop, from 1,534 m to 2,066 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Funivia del Corno del Renon carry?

Declared capacity is 1,800 people per hour, with 8 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Funivia del Corno del Renon open?

Opening times follow the lift calendar of Corno del Renon: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Funivia del Corno del Renon and how do you get there?

The valley station is in Corno del Renon, Trentino Alto Adige, at 1,534 m. The map on this page shows the starting point and the route up to 2,066 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.