Gondola · Folgarida-Marilleva · Trentino Alto Adige
Marilleva 900
Marilleva 900 (gondola) serves Folgarida-Marilleva, Trentino Alto Adige. The line measures 1,424 m and covers 531 m of vertical drop. The base station is at 906 m. The top station is at 1,437 m. The ride takes about 5.5 minutes. Declared capacity is 2,000 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,424 m
- Vertical drop
- 531 m
- Top station
- 1,437 m
- Hourly capacity
- 2,000 p/h
Technical data
Length 1,424 m · Vertical drop 531 m · Average gradient 37%
Gondola Marilleva 900, Base station 906 m, Top station 1,437 m, Length 1,424 m, Vertical drop 531 m, Average gradient 37%.
- Lift type
- Gondola
- Length
- 1,424 m
- Vertical drop
- 531 m
- Base station
- 906 m
- Top station
- 1,437 m
- Average gradient
- 37%
- Hourly capacity
- 2,000 p/h
- Seats per vehicle
- 12
- Ride time
- 5.5 min
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Folgarida-Marilleva
- Malghette Chairlift · 2,163 m
- Vigo Chairlift · 2,155 m
- Orso Bruno Chairlift · 2,145 m
- Doss della Pesa Chairlift · 2,119 m
- Doss della Pesa Drag lift · 2,119 m
- Ometto Chairlift · 2,098 m
- Spolverino Chairlift · 2,085 m
- Brenzi Chairlift · 2,085 m
Frequently asked questions
How long is Marilleva 900?
The line measures 1,424 m along the route mapped in OpenStreetMap, with 531 m of vertical drop.
How long is the ride on Marilleva 900?
The ride takes about 5.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Marilleva 900 cover?
Marilleva 900 covers 531 m of vertical drop, from 906 m to 1,437 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Marilleva 900 carry?
Declared capacity is 2,000 people per hour, with 12 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Marilleva 900 open?
Opening times follow the lift calendar of Folgarida-Marilleva: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Marilleva 900 and how do you get there?
The base station is in Folgarida-Marilleva, Trentino Alto Adige, at 906 m. The map on this page shows the starting point and the route up to 1,437 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.