Vai al contenuto

Gondola · Plan de Corones · Trentino Alto Adige

Olang I

Olang I (gondola) serves Plan de Corones, Trentino Alto Adige. The line measures 2,920 m and covers 890 m of vertical drop. The base station is at 1,180 m. The top station is at 2,070 m. The ride takes about 8.5 minutes. Declared capacity is 3,900 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
2,920 m
Vertical drop
890 m
Top station
2,070 m
Hourly capacity
3,900 p/h

Photos

Martin Fisch from Wiesbaden, GermanyCC BY 2.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,180 mTop station2,070 m2,920 m890 m30%

Length 2,920 m · Vertical drop 890 m · Average gradient 30%

Gondola Olang I, Base station 1,180 m, Top station 2,070 m, Length 2,920 m, Vertical drop 890 m, Average gradient 30%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
2,920 m
Vertical drop
890 m
Base station
1,180 m
Top station
2,070 m
Average gradient
30%
Hourly capacity
3,900 p/h
Seats per vehicle
10
Ride time
8.5 min
  • Heated seats
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Plan de Corones

  • Sonne Chairlift · 2,272 m
  • Belvedere Gondola · 2,272 m
  • Ruis Gondola · 2,264 m
  • Olang II Gondola · 2,262 m
  • Plateau Chairlift · 2,262 m
  • Kronplatz 2000 Gondola · 2,256 m
  • Kronplatz II Gondola · 2,256 m
  • Gipfelbahn Gondola · 2,250 m

All lifts in Plan de Corones →

Frequently asked questions

How long is Olang I?

The line measures 2,920 m along the route mapped in OpenStreetMap, with 890 m of vertical drop.

How long is the ride on Olang I?

The ride takes about 8.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Olang I cover?

Olang I covers 890 m of vertical drop, from 1,180 m to 2,070 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Olang I carry?

Declared capacity is 3,900 people per hour, with 10 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Olang I open?

Opening times follow the lift calendar of Plan de Corones: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Olang I and how do you get there?

The base station is in Plan de Corones, Trentino Alto Adige, at 1,180 m. The map on this page shows the starting point and the route up to 2,070 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.