Vai al contenuto

Gondola · Folgarida-Marilleva · Trentino Alto Adige

Panciana

Panciana (gondola) serves Folgarida-Marilleva, Trentino Alto Adige. The line measures 1,895 m and covers 429 m of vertical drop. The base station is at 1,435 m. The top station is at 1,864 m. The ride takes about 7.2 minutes. Declared capacity is 2,400 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,895 m
Vertical drop
429 m
Top station
1,864 m
Hourly capacity
2,400 p/h

Technical data

Base station1,435 mTop station1,864 m1,895 m429 m23%

Length 1,895 m · Vertical drop 429 m · Average gradient 23%

Gondola Panciana, Base station 1,435 m, Top station 1,864 m, Length 1,895 m, Vertical drop 429 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
1,895 m
Vertical drop
429 m
Base station
1,435 m
Top station
1,864 m
Average gradient
23%
Hourly capacity
2,400 p/h
Seats per vehicle
6
Ride time
7.2 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Folgarida-Marilleva

  • Malghette Chairlift · 2,163 m
  • Vigo Chairlift · 2,155 m
  • Orso Bruno Chairlift · 2,145 m
  • Doss della Pesa Chairlift · 2,119 m
  • Doss della Pesa Drag lift · 2,119 m
  • Ometto Chairlift · 2,098 m
  • Spolverino Chairlift · 2,085 m
  • Brenzi Chairlift · 2,085 m

All lifts in Folgarida-Marilleva →

Frequently asked questions

How long is Panciana?

The line measures 1,895 m along the route mapped in OpenStreetMap, with 429 m of vertical drop.

How long is the ride on Panciana?

The ride takes about 7.2 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Panciana cover?

Panciana covers 429 m of vertical drop, from 1,435 m to 1,864 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Panciana carry?

Declared capacity is 2,400 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Panciana open?

Opening times follow the lift calendar of Folgarida-Marilleva: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Panciana and how do you get there?

The base station is in Folgarida-Marilleva, Trentino Alto Adige, at 1,435 m. The map on this page shows the starting point and the route up to 1,864 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.