Gondola · Val Gardena · Trentino Alto Adige
Piz Seteur 1
Piz Seteur 1 (gondola) serves Val Gardena, Trentino Alto Adige. The line measures 994 m and covers 179 m of vertical drop. The valley station is at 1,794 m. The top station is at 1,973 m. The ride takes about 3 minutes. Declared capacity is 3,600 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 994 m
- Vertical drop
- 179 m
- Top station
- 1,973 m
- Hourly capacity
- 3,600 p/h
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
Published periods
-
Piz Seteur 1, Gran Paradiso · Summer 2026
11 Jun - 4 Oct 2026
Source: valgardena.it · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 994 m · Vertical drop 179 m · Average gradient 18%
Gondola Piz Seteur 1, Valley station 1,794 m, Top station 1,973 m, Length 994 m, Vertical drop 179 m, Average gradient 18%.
- Lift type
- Gondola
- Length
- 994 m
- Vertical drop
- 179 m
- Valley station
- 1,794 m
- Top station
- 1,973 m
- Average gradient
- 18%
- Hourly capacity
- 3,600 p/h
- Seats per vehicle
- 10
- Ride time
- 3 min
- Detachable grip
- Heated seats
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Val Gardena
- Cabinovia Forcella del Sassolungo Gondola · 2,737 m
- Fermeda Chairlift · 2,497 m
- Catores Chairlift · 2,477 m
- Furnes - Seceda Cable car · 2,433 m
- Col Rodella Gondola · 2,392 m
- Norei - 5 Dita Chairlift · 2,388 m
- Sasso Levante Chairlift · 2,387 m
- Salei Chairlift · 2,382 m
Frequently asked questions
How long is Piz Seteur 1?
The line measures 994 m along the route mapped in OpenStreetMap, with 179 m of vertical drop.
How long is the ride on Piz Seteur 1?
The ride takes about 3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Piz Seteur 1 cover?
Piz Seteur 1 covers 179 m of vertical drop, from 1,794 m to 1,973 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Piz Seteur 1 carry?
Declared capacity is 3,600 people per hour, with 10 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Piz Seteur 1 open?
Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Piz Seteur 1 and how do you get there?
The valley station is in Val Gardena, Trentino Alto Adige, at 1,794 m. The map on this page shows the starting point and the route up to 1,973 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.