Vai al contenuto

Gondola · Val Gardena · Trentino Alto Adige

Piz Seteur 2

Piz Seteur 2 (gondola) serves Val Gardena, Trentino Alto Adige. The line measures 520 m and covers 117 m of vertical drop. The base station is at 1,973 m. The top station is at 2,090 m. The ride takes about 1.5 minutes. Declared capacity is 3,600 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
520 m
Vertical drop
117 m
Top station
2,090 m
Hourly capacity
3,600 p/h

Photos

Wolfgang MoroderCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,973 mTop station2,090 m520 m117 m23%

Length 520 m · Vertical drop 117 m · Average gradient 23%

Gondola Piz Seteur 2, Base station 1,973 m, Top station 2,090 m, Length 520 m, Vertical drop 117 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
520 m
Vertical drop
117 m
Base station
1,973 m
Top station
2,090 m
Average gradient
23%
Hourly capacity
3,600 p/h
Seats per vehicle
10
Ride time
1.5 min
  • Detachable grip
  • Heated seats

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Val Gardena

  • Cabinovia Forcella del Sassolungo Gondola · 2,737 m
  • Fermeda Chairlift · 2,497 m
  • Catores Chairlift · 2,477 m
  • Furnes - Seceda Cable car · 2,433 m
  • Col Rodella Gondola · 2,392 m
  • Norei - 5 Dita Chairlift · 2,388 m
  • Sasso Levante Chairlift · 2,387 m
  • Salei Chairlift · 2,382 m

All lifts in Val Gardena →

Frequently asked questions

How long is Piz Seteur 2?

The line measures 520 m along the route mapped in OpenStreetMap, with 117 m of vertical drop.

How long is the ride on Piz Seteur 2?

The ride takes about 1.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Piz Seteur 2 cover?

Piz Seteur 2 covers 117 m of vertical drop, from 1,973 m to 2,090 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Piz Seteur 2 carry?

Declared capacity is 3,600 people per hour, with 10 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Piz Seteur 2 open?

Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Piz Seteur 2 and how do you get there?

The base station is in Val Gardena, Trentino Alto Adige, at 1,973 m. The map on this page shows the starting point and the route up to 2,090 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.