Plans

Plans (gondola) serves Val Gardena, Trentino Alto Adige. The line measures 1,194 m and covers 168 m of vertical drop. The base station is at 1,666 m. The top station is at 1,834 m. The ride takes about 4.33 minutes. Declared capacity is 2,200 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,194 m
Vertical drop
168 m
Top station
1,834 m
Hourly capacity
2,200 p/h

Technical data

Base station1,666 mTop station1,834 m1,194 m168 m14%

Length 1,194 m · Vertical drop 168 m · Average gradient 14%

Gondola Plans, Base station 1,666 m, Top station 1,834 m, Length 1,194 m, Vertical drop 168 m, Average gradient 14%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
1,194 m
Vertical drop
168 m
Base station
1,666 m
Top station
1,834 m
Average gradient
14%
Hourly capacity
2,200 p/h
Seats per vehicle
8
Ride time
4.33 min
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Val Gardena

  • Cabinovia Forcella del Sassolungo Gondola · 2,737 m
  • Fermeda Chairlift · 2,497 m
  • Catores Chairlift · 2,477 m
  • Furnes - Seceda Cable car · 2,433 m
  • Col Rodella Gondola · 2,392 m
  • Norei - 5 Dita Chairlift · 2,388 m
  • Sasso Levante Chairlift · 2,387 m
  • Salei Chairlift · 2,382 m

All lifts in Val Gardena →

Frequently asked questions

How long is Plans?

The line measures 1,194 m along the route mapped in OpenStreetMap, with 168 m of vertical drop.

How long is the ride on Plans?

The ride takes about 4.33 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Plans cover?

Plans covers 168 m of vertical drop, from 1,666 m to 1,834 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Plans carry?

Declared capacity is 2,200 people per hour, with 8 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Plans open?

Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Plans and how do you get there?

The base station is in Val Gardena, Trentino Alto Adige, at 1,666 m. The map on this page shows the starting point and the route up to 1,834 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.