Gondola · Plan de Corones · Trentino Alto Adige
Ried
Ried (gondola) serves Plan de Corones, Trentino Alto Adige. The line measures 4,264 m and covers 790 m of vertical drop. The base station is at 933 m. The top station is at 1,723 m. The ride takes about 13 minutes. Declared capacity is 3,200 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 4,264 m
- Vertical drop
- 790 m
- Top station
- 1,723 m
- Hourly capacity
- 3,200 p/h
Technical data
Length 4,264 m · Vertical drop 790 m · Average gradient 19%
Gondola Ried, Base station 933 m, Top station 1,723 m, Length 4,264 m, Vertical drop 790 m, Average gradient 19%.
- Lift type
- Gondola
- Length
- 4,264 m
- Vertical drop
- 790 m
- Base station
- 933 m
- Top station
- 1,723 m
- Average gradient
- 19%
- Hourly capacity
- 3,200 p/h
- Seats per vehicle
- 10
- Ride time
- 13 min
- Heated seats
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Plan de Corones
- Sonne Chairlift · 2,272 m
- Belvedere Gondola · 2,272 m
- Ruis Gondola · 2,264 m
- Olang II Gondola · 2,262 m
- Plateau Chairlift · 2,262 m
- Kronplatz 2000 Gondola · 2,256 m
- Kronplatz II Gondola · 2,256 m
- Gipfelbahn Gondola · 2,250 m
Frequently asked questions
How long is Ried?
The line measures 4,264 m along the route mapped in OpenStreetMap, with 790 m of vertical drop.
How long is the ride on Ried?
The ride takes about 13 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Ried cover?
Ried covers 790 m of vertical drop, from 933 m to 1,723 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Ried carry?
Declared capacity is 3,200 people per hour, with 10 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Ried open?
Opening times follow the lift calendar of Plan de Corones: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Ried and how do you get there?
The base station is in Plan de Corones, Trentino Alto Adige, at 933 m. The map on this page shows the starting point and the route up to 1,723 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.