Cable car · Merano 2000 · Trentino Alto Adige
Alta Muta
Alta Muta (cable car) serves Merano 2000, Trentino Alto Adige. The line measures 1,688 m and covers 661 m of vertical drop. The base station is at 697 m. The top station is at 1,358 m. The ride takes about 4 minutes. Declared capacity is 275 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,688 m
- Vertical drop
- 661 m
- Top station
- 1,358 m
- Hourly capacity
- 275 p/h
Technical data
Length 1,688 m · Vertical drop 661 m · Average gradient 39%
Cable car Alta Muta, Base station 697 m, Top station 1,358 m, Length 1,688 m, Vertical drop 661 m, Average gradient 39%.
- Lift type
- Cable car
- Length
- 1,688 m
- Vertical drop
- 661 m
- Base station
- 697 m
- Top station
- 1,358 m
- Average gradient
- 39%
- Hourly capacity
- 275 p/h
- Seats per vehicle
- 21
- Ride time
- 4 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Merano 2000
- Mittager Chairlift · 2,282 m
- Costa Valcanova Chairlift · 2,260 m
- S. Osvaldo Chairlift · 2,194 m
- Reinswald Gondola · 2,117 m
- Passo di Nova Gondola · 2,015 m
- Passo di Nova Gondola · 1,977 m
- Punta Cervina Cable car · 1,968 m
- Unnamed lift Magic carpet · 1,909 m
Frequently asked questions
How long is Alta Muta?
The line measures 1,688 m along the route mapped in OpenStreetMap, with 661 m of vertical drop.
How long is the ride on Alta Muta?
The ride takes about 4 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Alta Muta cover?
Alta Muta covers 661 m of vertical drop, from 697 m to 1,358 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Alta Muta carry?
Declared capacity is 275 people per hour, with 21 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Alta Muta open?
Opening times follow the lift calendar of Merano 2000: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Alta Muta and how do you get there?
The base station is in Merano 2000, Trentino Alto Adige, at 697 m. The map on this page shows the starting point and the route up to 1,358 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.