Cable car · Merano 2000 · Trentino Alto Adige
Funivia Merano 2000
Funivia Merano 2000 (cable car) serves Merano 2000, Trentino Alto Adige. The line measures 3,408 m and covers 1,223 m of vertical drop. The base station is at 649 m. The top station is at 1,872 m. The ride takes about 7 minutes. Declared capacity is 840 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 3,408 m
- Vertical drop
- 1,223 m
- Top station
- 1,872 m
- Hourly capacity
- 840 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 3,408 m · Vertical drop 1,223 m · Average gradient 36%
Cable car Funivia Merano 2000, Base station 649 m, Top station 1,872 m, Length 3,408 m, Vertical drop 1,223 m, Average gradient 36%.
- Lift type
- Cable car
- Length
- 3,408 m
- Vertical drop
- 1,223 m
- Base station
- 649 m
- Top station
- 1,872 m
- Average gradient
- 36%
- Hourly capacity
- 840 p/h
- Seats per vehicle
- 120
- Ride time
- 7 min
- Bubble cover
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Merano 2000
- Mittager Chairlift · 2,282 m
- Costa Valcanova Chairlift · 2,260 m
- S. Osvaldo Chairlift · 2,194 m
- Reinswald Gondola · 2,117 m
- Passo di Nova Gondola · 2,015 m
- Passo di Nova Gondola · 1,977 m
- Punta Cervina Cable car · 1,968 m
- Unnamed lift Magic carpet · 1,909 m
Frequently asked questions
How long is Funivia Merano 2000?
The line measures 3,408 m along the route mapped in OpenStreetMap, with 1,223 m of vertical drop.
How long is the ride on Funivia Merano 2000?
The ride takes about 7 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Funivia Merano 2000 cover?
Funivia Merano 2000 covers 1,223 m of vertical drop, from 649 m to 1,872 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Funivia Merano 2000 carry?
Declared capacity is 840 people per hour, with 120 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Funivia Merano 2000 open?
Opening times follow the lift calendar of Merano 2000: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Funivia Merano 2000 and how do you get there?
The base station is in Merano 2000, Trentino Alto Adige, at 649 m. The map on this page shows the starting point and the route up to 1,872 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.