Cable car · Paganella · Trentino Alto Adige
Funivia Trento Sardagna
Funivia Trento Sardagna (cable car) serves Paganella, Trentino Alto Adige. The line measures 1,068 m and covers 405 m of vertical drop. The valley station is at 185 m. The top station is at 590 m. The ride takes about 4 minutes. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,068 m
- Vertical drop
- 405 m
- Top station
- 590 m
- Ride time
- 4 min
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
We have no official calendar for this lift: below is the resort's, which may not apply to every lift.
Published periods
-
Monte Bondone: Palon chairlift · Summer 2026
10 Jul - 30 Aug 2026
Hours: 10:00-13:30 and 14:30-17:00
Operated by Trento Funivie. Suspended in bad weather.
Source: skimontebondone.it · checked on 23 September 2026
-
Andalo - Doss Pelà gondola · Autumn 2026
1 Sept - 27 Sept 2026
Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct, 17 Oct, 18 Oct
After 27 Sep open only on the listed weekends. The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.
Source: paganella.net · checked on 23 September 2026
-
Albi de Mez - Cima Paganella chairlift · Autumn 2026
1 Sept - 27 Sept 2026
Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct
The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.
Source: paganella.net · checked on 23 September 2026
-
Santel - Meriz (Fai della Paganella) chairlift · Autumn 2026
1 Sept - 27 Sept 2026
The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.
Source: paganella.net · checked on 23 September 2026
-
Meriz - La Selletta chairlift · Autumn 2026
1 Sept - 27 Sept 2026
Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct
The Selletta - Cima chairlift is closed. The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.
Source: paganella.net · checked on 23 September 2026
-
Molveno: Pradel gondola and Pradel - Tovre chairlift · Autumn 2026
1 Sept - 1 Nov 2026
The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.
Source: paganella.net · checked on 23 September 2026
-
Paganella · Winter 2026/27
Last season's dates, for guidance only
29 Nov 2025 - 6 Apr 2026
2025/26 season dates, for reference only: the 2026/27 calendar has not been published yet.
Source: paganella.net · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 1,068 m · Vertical drop 405 m · Average gradient 38%
Cable car Funivia Trento Sardagna, Valley station 185 m, Top station 590 m, Length 1,068 m, Vertical drop 405 m, Average gradient 38%.
- Lift type
- Cable car
- Length
- 1,068 m
- Vertical drop
- 405 m
- Valley station
- 185 m
- Top station
- 590 m
- Average gradient
- 38%
- Seats per vehicle
- 13
- Ride time
- 4 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Paganella
- La Selletta - Cima Paganella Chairlift · 2,118 m
- Albi de Mez - Cima Paganella Chairlift · 2,105 m
- Rocce-Rosse Chairlift · 1,977 m
- Pian Dosson - Selletta Gondola · 1,973 m
- Meriz - La Selletta Chairlift · 1,949 m
- Sant'Antonio Chairlift · 1,909 m
- Salare Conca Chairlift · 1,846 m
- Andalo - Doss Pelà Gondola · 1,759 m
Frequently asked questions
How long is Funivia Trento Sardagna?
The line measures 1,068 m along the route mapped in OpenStreetMap, with 405 m of vertical drop.
How long is the ride on Funivia Trento Sardagna?
The ride takes about 4 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Funivia Trento Sardagna cover?
Funivia Trento Sardagna covers 405 m of vertical drop, from 185 m to 590 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
When is Funivia Trento Sardagna open?
Opening times follow the lift calendar of Paganella: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Funivia Trento Sardagna and how do you get there?
The valley station is in Paganella, Trentino Alto Adige, at 185 m. The map on this page shows the starting point and the route up to 590 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.