Alta Vista (16) (chairlift) serves Livigno, Lombardia. The line measures 1,271 m and covers 435 m of vertical drop. The valley station is at 2,336 m. The top station is at 2,771 m. The ride takes about 4.2 minutes. Declared capacity is 2,400 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,271 m
Vertical drop
435 m
Top station
2,771 m
Hourly capacity
2,400 p/h

Photos

qwesy qwesyCC BY 3.0 · Wikimedia Commons
qwesy qwesyCC BY 3.0 · Commons
qwesy qwesyCC BY 3.0 · Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Mottolino · Summer 2026

    13 Jun - 27 Sept 2026

    Hours: 9:00-16:40

    Mottolino gondola and bike park open until Sunday 27 September 2026.

    Official sources disagree: The Carosello 3000 rates page lists the Mottolino gondola "from 7 June to 28 September" with no year: those are the 2025 dates. The Mottolino site prevails.

    Source: mottolino.com · checked on 23 September 2026

  • Carosello 3000 · Summer 2026

    20 Jun - 13 Sept 2026

    The Carosello 3000 gondola (San Rocco) ended its summer season on 13 September. The operator gives 28 November as winter opening.

    Source: carosello3000.com · checked on 23 September 2026

  • Sitas - Livigno Centro gondola · Summer 2026

    1 Jul - 31 Aug 2026

    Official sources disagree: The provincial portal valtellina.it gives 20 June as opening for the Sitas Bike Area, with no closing date.

    Source: carosello3000.com · checked on 23 September 2026

  • Livigno · Winter 2026/27

    Dates planned by the operator

    28 Nov 2026 - 2 May 2027

    Opening announced for Saturday 28 November 2026 from 8:00. For the closing the official site only says "until early May": 2 May 2027 is the end of the 2026/27 lift pass price list, not an announced closing date.

    Source: livigno.eu · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station2,336 mTop station2,771 m1,271 m435 m34%

Length 1,271 m · Vertical drop 435 m · Average gradient 34%

Chairlift Alta Vista (16), Valley station 2,336 m, Top station 2,771 m, Length 1,271 m, Vertical drop 435 m, Average gradient 34%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,271 m
Vertical drop
435 m
Valley station
2,336 m
Top station
2,771 m
Average gradient
34%
Hourly capacity
2,400 p/h
Seats per vehicle
6
Ride time
4.2 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Livigno

  • Carosello 3000 II (12) Gondola · 2,783 m
  • Baby Lac Salin (13) Chairlift · 2,753 m
  • Unnamed lift Magic carpet · 2,753 m
  • Federia (14) Chairlift · 2,745 m
  • Fontane Vetta (19) Chairlift · 2,695 m
  • Valfin Monte della Neve (4) Chairlift · 2,685 m
  • Blesaccia I (15) Chairlift · 2,627 m
  • Valandrea - Vetta (28) Chairlift · 2,609 m

All lifts in Livigno →

Frequently asked questions

How long is Alta Vista (16)?

The line measures 1,271 m along the route mapped in OpenStreetMap, with 435 m of vertical drop.

How long is the ride on Alta Vista (16)?

The ride takes about 4.2 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Alta Vista (16) cover?

Alta Vista (16) covers 435 m of vertical drop, from 2,336 m to 2,771 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Alta Vista (16) carry?

Declared capacity is 2,400 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Alta Vista (16) open?

Opening times follow the lift calendar of Livigno: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Alta Vista (16) and how do you get there?

The valley station is in Livigno, Lombardia, at 2,336 m. The map on this page shows the starting point and the route up to 2,771 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.