Chairlift · Arabba · Veneto
Arabba Fly
Arabba Fly (chairlift) serves Arabba, Veneto. The line measures 447 m and covers 37 m of vertical drop. The base station is at 1,634 m. The top station is at 1,671 m. The ride takes about 1.5 minutes. Declared capacity is 6,000 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 447 m
- Vertical drop
- 37 m
- Top station
- 1,671 m
- Hourly capacity
- 6,000 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 447 m · Vertical drop 37 m · Average gradient 8%
Chairlift Arabba Fly, Base station 1,634 m, Top station 1,671 m, Length 447 m, Vertical drop 37 m, Average gradient 8%.
- Lift type
- Chairlift
- Length
- 447 m
- Vertical drop
- 37 m
- Base station
- 1,634 m
- Top station
- 1,671 m
- Average gradient
- 8%
- Hourly capacity
- 6,000 p/h
- Seats per vehicle
- 6
- Ride time
- 1.5 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Season and opening times
- open in summer
- 12 June 2026 - 27 September 2026
www.funiviemarmolada.com · 23 August 2026
Other lifts in Arabba
- Serauta - Punta Rocca Cable car · 3,215 m
- Sass Pordoi Cable car · 2,919 m
- Coston d’Antermoja - Serauta Cable car · 2,871 m
- Vallon Chairlift · 2,521 m
- Funifor Arabba - Portavescovo Cable car · 2,455 m
- Padon Chairlift · 2,416 m
- Sass Becè Chairlift · 2,398 m
- Lezuo Gondola · 2,392 m
Frequently asked questions
How long is Arabba Fly?
The line measures 447 m along the route mapped in OpenStreetMap, with 37 m of vertical drop.
How long is the ride on Arabba Fly?
The ride takes about 1.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Arabba Fly cover?
Arabba Fly covers 37 m of vertical drop, from 1,634 m to 1,671 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Arabba Fly carry?
Declared capacity is 6,000 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Arabba Fly open?
Opening times follow the lift calendar of Arabba: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Arabba Fly and how do you get there?
The base station is in Arabba, Veneto, at 1,634 m. The map on this page shows the starting point and the route up to 1,671 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.