Vai al contenuto

Chairlift · La Thuile · Valle d'Aosta

Arnouvaz

Arnouvaz (chairlift) serves La Thuile, Valle d'Aosta. The line measures 936 m and covers 266 m of vertical drop. The base station is at 1,957 m. The top station is at 2,223 m. The ride takes about 8.3 minutes. Declared capacity is 1,800 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
936 m
Vertical drop
266 m
Top station
2,223 m
Hourly capacity
1,800 p/h

Photos

DimiTalenCC0 · Wikimedia Commons
DimiTalenCC0 · Commons
DimiTalenCC0 · Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,957 mTop station2,223 m936 m266 m28%

Length 936 m · Vertical drop 266 m · Average gradient 28%

Chairlift Arnouvaz, Base station 1,957 m, Top station 2,223 m, Length 936 m, Vertical drop 266 m, Average gradient 28%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
936 m
Vertical drop
266 m
Base station
1,957 m
Top station
2,223 m
Average gradient
28%
Hourly capacity
1,800 p/h
Seats per vehicle
3
Ride time
8.3 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in La Thuile

  • Belvédére Chairlift · 2,594 m
  • Chaz Dura Express 2 Chairlift · 2,557 m
  • Piccolo San Bernardo Express Chairlift · 2,474 m
  • Fourclaz Express Chairlift · 2,448 m
  • Nastro Gallery Magic carpet · 2,395 m
  • Gran Testa Drag lift · 2,389 m
  • Argillien Express Chairlift · 2,387 m
  • Chalets Express Chairlift · 2,352 m

All lifts in La Thuile →

Frequently asked questions

How long is Arnouvaz?

The line measures 936 m along the route mapped in OpenStreetMap, with 266 m of vertical drop.

How long is the ride on Arnouvaz?

The ride takes about 8.3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Arnouvaz cover?

Arnouvaz covers 266 m of vertical drop, from 1,957 m to 2,223 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Arnouvaz carry?

Declared capacity is 1,800 people per hour, with 3 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Arnouvaz open?

Opening times follow the lift calendar of La Thuile: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Arnouvaz and how do you get there?

The base station is in La Thuile, Valle d'Aosta, at 1,957 m. The map on this page shows the starting point and the route up to 2,223 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.