Vai al contenuto

Chairlift · Cortina d'Ampezzo · Veneto

Cacciatori

Cacciatori (chairlift) serves Cortina d'Ampezzo, Veneto. The line measures 601 m and covers 136 m of vertical drop. The valley station is at 2,452 m. The top station is at 2,588 m. The ride takes about 4.3 minutes. Declared capacity is 1,200 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
601 m
Vertical drop
136 m
Top station
2,588 m
Hourly capacity
1,200 p/h

Photos

Graeme Churchard from Bristol (51.4414, -2.5242), UKCC BY 2.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Funivia Lagazuoi (Passo Falzarego) · Summer 2026

    6 Jun - 18 Oct 2026

    Hours: 9:00-17:00

    A departure every 15 minutes; last ascent 16:40, last descent 17:00.

    Source: lagazuoi.it · checked on 23 September 2026

  • Tofana - Freccia nel Cielo · Summer 2026

    13 Jun - 27 Sept 2026

    Hours: first run from Cortina 9:00; last descent from Cima Tofana 16:50

    Source: freccianelcielo.com · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station2,452 mTop station2,588 m601 m136 m23%

Length 601 m · Vertical drop 136 m · Average gradient 23%

Chairlift Cacciatori, Valley station 2,452 m, Top station 2,588 m, Length 601 m, Vertical drop 136 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
601 m
Vertical drop
136 m
Valley station
2,452 m
Top station
2,588 m
Average gradient
23%
Hourly capacity
1,200 p/h
Seats per vehicle
2
Ride time
4.3 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Cortina d'Ampezzo

  • Ra Valles - Cima Tofana Cable car · 3,139 m
  • Bus Tofana Chairlift · 2,719 m
  • Falzarego - Lagazuoi Cable car · 2,717 m
  • Col Drusciè - Ra Valles Cable car · 2,453 m
  • Fedare - Nuvolao Chairlift · 2,429 m
  • Alpe Potor - Nuvolao Chairlift · 2,428 m
  • Croda Negra Chairlift · 2,404 m
  • Vitelli Chairlift · 2,324 m

All lifts in Cortina d'Ampezzo →

Frequently asked questions

How long is Cacciatori?

The line measures 601 m along the route mapped in OpenStreetMap, with 136 m of vertical drop.

How long is the ride on Cacciatori?

The ride takes about 4.3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Cacciatori cover?

Cacciatori covers 136 m of vertical drop, from 2,452 m to 2,588 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Cacciatori carry?

Declared capacity is 1,200 people per hour, with 2 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Cacciatori open?

Opening times follow the lift calendar of Cortina d'Ampezzo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Cacciatori and how do you get there?

The valley station is in Cortina d'Ampezzo, Veneto, at 2,452 m. The map on this page shows the starting point and the route up to 2,588 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.