Vai al contenuto

Chairlift · Val Gardena · Trentino Alto Adige

Cir

Cir (chairlift) serves Val Gardena, Trentino Alto Adige. The line measures 671 m and covers 177 m of vertical drop. The base station is at 2,144 m. The top station is at 2,321 m. The ride takes about 3.17 minutes. Declared capacity is 2,400 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
671 m
Vertical drop
177 m
Top station
2,321 m
Hourly capacity
2,400 p/h

Photos

Wolfgang MoroderCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station2,144 mTop station2,321 m671 m177 m26%

Length 671 m · Vertical drop 177 m · Average gradient 26%

Chairlift Cir, Base station 2,144 m, Top station 2,321 m, Length 671 m, Vertical drop 177 m, Average gradient 26%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
671 m
Vertical drop
177 m
Base station
2,144 m
Top station
2,321 m
Average gradient
26%
Hourly capacity
2,400 p/h
Seats per vehicle
4
Ride time
3.17 min
  • Detachable grip
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Val Gardena

  • Cabinovia Forcella del Sassolungo Gondola · 2,737 m
  • Fermeda Chairlift · 2,497 m
  • Catores Chairlift · 2,477 m
  • Furnes - Seceda Cable car · 2,433 m
  • Col Rodella Gondola · 2,392 m
  • Norei - 5 Dita Chairlift · 2,388 m
  • Sasso Levante Chairlift · 2,387 m
  • Salei Chairlift · 2,382 m

All lifts in Val Gardena →

Frequently asked questions

How long is Cir?

The line measures 671 m along the route mapped in OpenStreetMap, with 177 m of vertical drop.

How long is the ride on Cir?

The ride takes about 3.17 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Cir cover?

Cir covers 177 m of vertical drop, from 2,144 m to 2,321 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Cir carry?

Declared capacity is 2,400 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Cir open?

Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Cir and how do you get there?

The base station is in Val Gardena, Trentino Alto Adige, at 2,144 m. The map on this page shows the starting point and the route up to 2,321 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.