Vai al contenuto

Chairlift · Val Gardena · Trentino Alto Adige

Cisles

Cisles (chairlift) serves Val Gardena, Trentino Alto Adige. The line measures 380 m and covers 164 m of vertical drop. The valley station is at 1,938 m. The top station is at 2,102 m. The ride takes about 3.8 minutes. Declared capacity is 1,200 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
380 m
Vertical drop
164 m
Top station
2,102 m
Hourly capacity
1,200 p/h

Photos

Wolfgang MoroderCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Resciesa · Summer 2026

    16 May - 11 Oct 2026

    Ortisei - Resciesa funicular.

    Source: valgardena.it · checked on 23 September 2026

  • Col Raiser · Summer 2026

    22 May - 1 Nov 2026

    Source: valgardena.it · checked on 23 September 2026

  • Ortisei - Furnes - Seceda · Summer 2026

    22 May - 2 Nov 2026

    Hours: 8:30-17:30

    The Fermeda chairlift follows a different schedule.

    Source: seceda.it · checked on 23 September 2026

  • Forcella Sassolungo · Summer 2026

    30 May - 11 Oct 2026

    Source: valgardena.it · checked on 23 September 2026

  • Mont de Seura · Summer 2026

    1 Jun - 11 Oct 2026

    Source: valgardena.it · checked on 23 September 2026

  • Ciampinoi · Summer 2026

    6 Jun - 11 Oct 2026

    Source: valgardena.it · checked on 23 September 2026

  • S. Cristina - Monte Pana · Summer 2026

    6 Jun - 27 Sept 2026

    Source: valgardena.it · checked on 23 September 2026

  • Piz Seteur 1, Gran Paradiso · Summer 2026

    11 Jun - 4 Oct 2026

    Source: valgardena.it · checked on 23 September 2026

  • Dantercepies I-II · Summer 2026

    12 Jun - 4 Oct 2026

    Source: valgardena.it · checked on 23 September 2026

  • Costabella · Summer 2026

    12 Jun - 20 Sept 2026

    Source: valgardena.it · checked on 23 September 2026

  • Cir · Summer 2026

    13 Jun - 20 Sept 2026

    Source: valgardena.it · checked on 23 September 2026

  • Piza Pranseies · Summer 2026

    13 Jun - 13 Sept 2026

    Source: valgardena.it · checked on 23 September 2026

  • Fermeda · Summer 2026

    20 Jun - 20 Sept 2026

    Source: valgardena.it · checked on 23 September 2026

  • Val Gardena · Winter 2026/27

    Dates planned by the operator

    4 Dec 2026 - 4 Apr 2027

    Opening on 4 December 2026; closing given as "presumably" 4 April 2027.

    Source: valgardena.it · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,938 mTop station2,102 m380 m164 m43%

Length 380 m · Vertical drop 164 m · Average gradient 43%

Chairlift Cisles, Valley station 1,938 m, Top station 2,102 m, Length 380 m, Vertical drop 164 m, Average gradient 43%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
380 m
Vertical drop
164 m
Valley station
1,938 m
Top station
2,102 m
Average gradient
43%
Hourly capacity
1,200 p/h
Seats per vehicle
2
Ride time
3.8 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Val Gardena

  • Cabinovia Forcella del Sassolungo Gondola · 2,737 m
  • Fermeda Chairlift · 2,497 m
  • Catores Chairlift · 2,477 m
  • Furnes - Seceda Cable car · 2,433 m
  • Col Rodella Gondola · 2,392 m
  • Norei - 5 Dita Chairlift · 2,388 m
  • Sasso Levante Chairlift · 2,387 m
  • Salei Chairlift · 2,382 m

All lifts in Val Gardena →

Frequently asked questions

How long is Cisles?

The line measures 380 m along the route mapped in OpenStreetMap, with 164 m of vertical drop.

How long is the ride on Cisles?

The ride takes about 3.8 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Cisles cover?

Cisles covers 164 m of vertical drop, from 1,938 m to 2,102 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Cisles carry?

Declared capacity is 1,200 people per hour, with 2 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Cisles open?

Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Cisles and how do you get there?

The valley station is in Val Gardena, Trentino Alto Adige, at 1,938 m. The map on this page shows the starting point and the route up to 2,102 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.