Vai al contenuto

Chairlift · Cortina d'Ampezzo · Veneto

Falzarego

Falzarego (chairlift) serves Cortina d'Ampezzo, Veneto. The line measures 456 m and covers 104 m of vertical drop. The valley station is at 2,053 m. The top station is at 2,157 m. The ride takes about 3.5 minutes. Declared capacity is 1,800 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
456 m
Vertical drop
104 m
Top station
2,157 m
Hourly capacity
1,800 p/h

Photos

Hiroki OgawaCC BY 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Funivia Lagazuoi (Passo Falzarego) · Summer 2026

    6 Jun - 18 Oct 2026

    Hours: 9:00-17:00

    A departure every 15 minutes; last ascent 16:40, last descent 17:00.

    Source: lagazuoi.it · checked on 23 September 2026

  • Tofana - Freccia nel Cielo · Summer 2026

    13 Jun - 27 Sept 2026

    Hours: first run from Cortina 9:00; last descent from Cima Tofana 16:50

    Source: freccianelcielo.com · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station2,053 mTop station2,157 m456 m104 m23%

Length 456 m · Vertical drop 104 m · Average gradient 23%

Chairlift Falzarego, Valley station 2,053 m, Top station 2,157 m, Length 456 m, Vertical drop 104 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
456 m
Vertical drop
104 m
Valley station
2,053 m
Top station
2,157 m
Average gradient
23%
Hourly capacity
1,800 p/h
Seats per vehicle
3
Ride time
3.5 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Cortina d'Ampezzo

  • Ra Valles - Cima Tofana Cable car · 3,139 m
  • Bus Tofana Chairlift · 2,719 m
  • Falzarego - Lagazuoi Cable car · 2,717 m
  • Cacciatori Chairlift · 2,588 m
  • Col Drusciè - Ra Valles Cable car · 2,453 m
  • Fedare - Nuvolao Chairlift · 2,429 m
  • Alpe Potor - Nuvolao Chairlift · 2,428 m
  • Croda Negra Chairlift · 2,404 m

All lifts in Cortina d'Ampezzo →

Frequently asked questions

How long is Falzarego?

The line measures 456 m along the route mapped in OpenStreetMap, with 104 m of vertical drop.

How long is the ride on Falzarego?

The ride takes about 3.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Falzarego cover?

Falzarego covers 104 m of vertical drop, from 2,053 m to 2,157 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Falzarego carry?

Declared capacity is 1,800 people per hour, with 3 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Falzarego open?

Opening times follow the lift calendar of Cortina d'Ampezzo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Falzarego and how do you get there?

The valley station is in Cortina d'Ampezzo, Veneto, at 2,053 m. The map on this page shows the starting point and the route up to 2,157 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.