Vai al contenuto

Chairlift · Folgarida-Marilleva · Trentino Alto Adige

Mastellina

Mastellina (chairlift) serves Folgarida-Marilleva, Trentino Alto Adige. The line measures 880 m and covers 195 m of vertical drop. The base station is at 1,842 m. The top station is at 2,037 m. The ride takes about 7.2 minutes. Declared capacity is 700 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
880 m
Vertical drop
195 m
Top station
2,037 m
Hourly capacity
700 p/h

Photos

AbxbayCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,842 mTop station2,037 m880 m195 m22%

Length 880 m · Vertical drop 195 m · Average gradient 22%

Chairlift Mastellina, Base station 1,842 m, Top station 2,037 m, Length 880 m, Vertical drop 195 m, Average gradient 22%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
880 m
Vertical drop
195 m
Base station
1,842 m
Top station
2,037 m
Average gradient
22%
Hourly capacity
700 p/h
Seats per vehicle
3
Ride time
7.2 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Folgarida-Marilleva

  • Malghette Chairlift · 2,163 m
  • Vigo Chairlift · 2,155 m
  • Orso Bruno Chairlift · 2,145 m
  • Doss della Pesa Chairlift · 2,119 m
  • Doss della Pesa Drag lift · 2,119 m
  • Ometto Chairlift · 2,098 m
  • Spolverino Chairlift · 2,085 m
  • Brenzi Chairlift · 2,085 m

All lifts in Folgarida-Marilleva →

Frequently asked questions

How long is Mastellina?

The line measures 880 m along the route mapped in OpenStreetMap, with 195 m of vertical drop.

How long is the ride on Mastellina?

The ride takes about 7.2 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Mastellina cover?

Mastellina covers 195 m of vertical drop, from 1,842 m to 2,037 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Mastellina carry?

Declared capacity is 700 people per hour, with 3 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Mastellina open?

Opening times follow the lift calendar of Folgarida-Marilleva: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Mastellina and how do you get there?

The base station is in Folgarida-Marilleva, Trentino Alto Adige, at 1,842 m. The map on this page shows the starting point and the route up to 2,037 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.