Vai al contenuto

Chairlift · Merano 2000 · Trentino Alto Adige

Merano - Tirolo

Merano - Tirolo (chairlift) serves Merano 2000, Trentino Alto Adige. The line measures 397 m and covers 177 m of vertical drop. The valley station is at 320 m. The top station is at 497 m. The ride takes about 5 minutes. Declared capacity is 249 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
397 m
Vertical drop
177 m
Top station
497 m
Hourly capacity
249 p/h

Photos

Mateus2019CC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Merano 2000 · Summer 2026

    1 May - 8 Nov 2026

    Summer season of the area: not every lift stays open for the whole period.

    Source: meran2000.com · checked on 23 September 2026

  • Merano 2000 · Winter 2026/27

    27 Nov 2026 - 29 Mar 2027

    Hours: cable car Mon-Fri 9:00-17:30, weekends and holidays 8:30-17:30; 26/12-6/1 and 6/2-14/2 8:00-17:30

    Source: cms.meran2000.com · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station320 mTop station497 m397 m177 m45%

Length 397 m · Vertical drop 177 m · Average gradient 45%

Chairlift Merano - Tirolo, Valley station 320 m, Top station 497 m, Length 397 m, Vertical drop 177 m, Average gradient 45%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
397 m
Vertical drop
177 m
Valley station
320 m
Top station
497 m
Average gradient
45%
Hourly capacity
249 p/h
Seats per vehicle
1
Ride time
5 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Merano 2000

  • Mittager Chairlift · 2,282 m
  • Costa Valcanova Chairlift · 2,260 m
  • S. Osvaldo Chairlift · 2,194 m
  • Reinswald Gondola · 2,117 m
  • Passo di Nova Gondola · 2,015 m
  • Passo di Nova Gondola · 1,977 m
  • Punta Cervina Cable car · 1,968 m
  • Unnamed lift Magic carpet · 1,909 m

All lifts in Merano 2000 →

Frequently asked questions

How long is Merano - Tirolo?

The line measures 397 m along the route mapped in OpenStreetMap, with 177 m of vertical drop.

How long is the ride on Merano - Tirolo?

The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Merano - Tirolo cover?

Merano - Tirolo covers 177 m of vertical drop, from 320 m to 497 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Merano - Tirolo carry?

Declared capacity is 249 people per hour, with 1 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Merano - Tirolo open?

Opening times follow the lift calendar of Merano 2000: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Merano - Tirolo and how do you get there?

The valley station is in Merano 2000, Trentino Alto Adige, at 320 m. The map on this page shows the starting point and the route up to 497 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.