Vai al contenuto

Chairlift · Paganella · Trentino Alto Adige

Prati di Gaggia - Paganella 2

Prati di Gaggia - Paganella 2 (chairlift) serves Paganella, Trentino Alto Adige. The line measures 1,753 m and covers 425 m of vertical drop. The valley station is at 1,334 m. The top station is at 1,759 m. Declared capacity is 1,500 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,753 m
Vertical drop
425 m
Top station
1,759 m
Hourly capacity
1,500 p/h

Photos

Zoran Kurelić RabkoCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Monte Bondone: Palon chairlift · Summer 2026

    10 Jul - 30 Aug 2026

    Hours: 10:00-13:30 and 14:30-17:00

    Operated by Trento Funivie. Suspended in bad weather.

    Source: skimontebondone.it · checked on 23 September 2026

  • Andalo - Doss Pelà gondola · Autumn 2026

    1 Sept - 27 Sept 2026

    Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct, 17 Oct, 18 Oct

    After 27 Sep open only on the listed weekends. The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.

    Source: paganella.net · checked on 23 September 2026

  • Albi de Mez - Cima Paganella chairlift · Autumn 2026

    1 Sept - 27 Sept 2026

    Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct

    The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.

    Source: paganella.net · checked on 23 September 2026

  • Santel - Meriz (Fai della Paganella) chairlift · Autumn 2026

    1 Sept - 27 Sept 2026

    The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.

    Source: paganella.net · checked on 23 September 2026

  • Meriz - La Selletta chairlift · Autumn 2026

    1 Sept - 27 Sept 2026

    Extra days: 3 Oct, 4 Oct, 10 Oct, 11 Oct

    The Selletta - Cima chairlift is closed. The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.

    Source: paganella.net · checked on 23 September 2026

  • Molveno: Pradel gondola and Pradel - Tovre chairlift · Autumn 2026

    1 Sept - 1 Nov 2026

    The operator only publishes its September 2026 update with end-of-season dates: the summer start date is not given.

    Source: paganella.net · checked on 23 September 2026

  • Paganella · Winter 2026/27

    Last season's dates, for guidance only

    29 Nov 2025 - 6 Apr 2026

    2025/26 season dates, for reference only: the 2026/27 calendar has not been published yet.

    Source: paganella.net · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,334 mTop station1,759 m1,753 m425 m24%

Length 1,753 m · Vertical drop 425 m · Average gradient 24%

Chairlift Prati di Gaggia - Paganella 2, Valley station 1,334 m, Top station 1,759 m, Length 1,753 m, Vertical drop 425 m, Average gradient 24%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,753 m
Vertical drop
425 m
Valley station
1,334 m
Top station
1,759 m
Average gradient
24%
Hourly capacity
1,500 p/h
Seats per vehicle
4

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Paganella

  • La Selletta - Cima Paganella Chairlift · 2,118 m
  • Albi de Mez - Cima Paganella Chairlift · 2,105 m
  • Rocce-Rosse Chairlift · 1,977 m
  • Pian Dosson - Selletta Gondola · 1,973 m
  • Meriz - La Selletta Chairlift · 1,949 m
  • Sant'Antonio Chairlift · 1,909 m
  • Salare Conca Chairlift · 1,846 m
  • Andalo - Doss Pelà Gondola · 1,759 m

All lifts in Paganella →

Frequently asked questions

How long is Prati di Gaggia - Paganella 2?

The line measures 1,753 m along the route mapped in OpenStreetMap, with 425 m of vertical drop.

What vertical drop does Prati di Gaggia - Paganella 2 cover?

Prati di Gaggia - Paganella 2 covers 425 m of vertical drop, from 1,334 m to 1,759 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Prati di Gaggia - Paganella 2 carry?

Declared capacity is 1,500 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Prati di Gaggia - Paganella 2 open?

Opening times follow the lift calendar of Paganella: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Prati di Gaggia - Paganella 2 and how do you get there?

The valley station is in Paganella, Trentino Alto Adige, at 1,334 m. The map on this page shows the starting point and the route up to 1,759 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.