Chairlift · Val Gardena · Trentino Alto Adige
Santa Cristina - Monte Pana
Santa Cristina - Monte Pana (chairlift) serves Val Gardena, Trentino Alto Adige. The line measures 801 m and covers 225 m of vertical drop. The base station is at 1,393 m. The top station is at 1,618 m. Declared capacity is 900 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 801 m
- Vertical drop
- 225 m
- Top station
- 1,618 m
- Hourly capacity
- 900 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 801 m · Vertical drop 225 m · Average gradient 28%
Chairlift Santa Cristina - Monte Pana, Base station 1,393 m, Top station 1,618 m, Length 801 m, Vertical drop 225 m, Average gradient 28%.
- Lift type
- Chairlift
- Length
- 801 m
- Vertical drop
- 225 m
- Base station
- 1,393 m
- Top station
- 1,618 m
- Average gradient
- 28%
- Hourly capacity
- 900 p/h
- Seats per vehicle
- 2
- Bike transport
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Val Gardena
- Cabinovia Forcella del Sassolungo Gondola · 2,737 m
- Fermeda Chairlift · 2,497 m
- Catores Chairlift · 2,477 m
- Furnes - Seceda Cable car · 2,433 m
- Col Rodella Gondola · 2,392 m
- Norei - 5 Dita Chairlift · 2,388 m
- Sasso Levante Chairlift · 2,387 m
- Salei Chairlift · 2,382 m
Frequently asked questions
How long is Santa Cristina - Monte Pana?
The line measures 801 m along the route mapped in OpenStreetMap, with 225 m of vertical drop.
What vertical drop does Santa Cristina - Monte Pana cover?
Santa Cristina - Monte Pana covers 225 m of vertical drop, from 1,393 m to 1,618 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Santa Cristina - Monte Pana carry?
Declared capacity is 900 people per hour, with 2 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Santa Cristina - Monte Pana open?
Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Santa Cristina - Monte Pana and how do you get there?
The base station is in Val Gardena, Trentino Alto Adige, at 1,393 m. The map on this page shows the starting point and the route up to 1,618 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.