Vai al contenuto

Chairlift · Paganella · Trentino Alto Adige

Santel - Meriz

Santel - Meriz (chairlift) serves Paganella, Trentino Alto Adige. The line measures 1,294 m and covers 390 m of vertical drop. The base station is at 1,036 m. The top station is at 1,426 m. Declared capacity is 1,260 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,294 m
Vertical drop
390 m
Top station
1,426 m
Hourly capacity
1,260 p/h

Photos

Zoran Kurelić RabkoCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,036 mTop station1,426 m1,294 m390 m30%

Length 1,294 m · Vertical drop 390 m · Average gradient 30%

Chairlift Santel - Meriz, Base station 1,036 m, Top station 1,426 m, Length 1,294 m, Vertical drop 390 m, Average gradient 30%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,294 m
Vertical drop
390 m
Base station
1,036 m
Top station
1,426 m
Average gradient
30%
Hourly capacity
1,260 p/h
Seats per vehicle
4
  • Bubble cover
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Paganella

  • La Selletta - Cima Paganella Chairlift · 2,118 m
  • Albi de Mez - Cima Paganella Chairlift · 2,105 m
  • Rocce-Rosse Chairlift · 1,977 m
  • Pian Dosson - Selletta Gondola · 1,973 m
  • Meriz - La Selletta Chairlift · 1,949 m
  • Sant'Antonio Chairlift · 1,909 m
  • Salare Conca Chairlift · 1,846 m
  • Andalo - Doss Pelà Gondola · 1,759 m

All lifts in Paganella →

Frequently asked questions

How long is Santel - Meriz?

The line measures 1,294 m along the route mapped in OpenStreetMap, with 390 m of vertical drop.

What vertical drop does Santel - Meriz cover?

Santel - Meriz covers 390 m of vertical drop, from 1,036 m to 1,426 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Santel - Meriz carry?

Declared capacity is 1,260 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Santel - Meriz open?

Opening times follow the lift calendar of Paganella: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Santel - Meriz and how do you get there?

The base station is in Paganella, Trentino Alto Adige, at 1,036 m. The map on this page shows the starting point and the route up to 1,426 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.