Vai al contenuto

Chairlift · Val Gardena · Trentino Alto Adige

Sochers - Ciampinoi

Sochers - Ciampinoi (chairlift) serves Val Gardena, Trentino Alto Adige. The line measures 958 m and covers 255 m of vertical drop. The base station is at 1,946 m. The top station is at 2,201 m. The ride takes about 3.5 minutes. Declared capacity is 2,000 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
958 m
Vertical drop
255 m
Top station
2,201 m
Hourly capacity
2,000 p/h

Photos

Wolfgang MoroderCC BY-SA 3.0 · Wikimedia Commons
Wolfgang MoroderCC BY-SA 3.0 · Commons
Wolfgang MoroderCC BY-SA 3.0 · Commons
Wolfgang MoroderCC BY-SA 3.0 · Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,946 mTop station2,201 m958 m255 m27%

Length 958 m · Vertical drop 255 m · Average gradient 27%

Chairlift Sochers - Ciampinoi, Base station 1,946 m, Top station 2,201 m, Length 958 m, Vertical drop 255 m, Average gradient 27%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
958 m
Vertical drop
255 m
Base station
1,946 m
Top station
2,201 m
Average gradient
27%
Hourly capacity
2,000 p/h
Seats per vehicle
6
Ride time
3.5 min
  • Detachable grip
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Val Gardena

  • Cabinovia Forcella del Sassolungo Gondola · 2,737 m
  • Fermeda Chairlift · 2,497 m
  • Catores Chairlift · 2,477 m
  • Furnes - Seceda Cable car · 2,433 m
  • Col Rodella Gondola · 2,392 m
  • Norei - 5 Dita Chairlift · 2,388 m
  • Sasso Levante Chairlift · 2,387 m
  • Salei Chairlift · 2,382 m

All lifts in Val Gardena →

Frequently asked questions

How long is Sochers - Ciampinoi?

The line measures 958 m along the route mapped in OpenStreetMap, with 255 m of vertical drop.

How long is the ride on Sochers - Ciampinoi?

The ride takes about 3.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Sochers - Ciampinoi cover?

Sochers - Ciampinoi covers 255 m of vertical drop, from 1,946 m to 2,201 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Sochers - Ciampinoi carry?

Declared capacity is 2,000 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Sochers - Ciampinoi open?

Opening times follow the lift calendar of Val Gardena: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Sochers - Ciampinoi and how do you get there?

The base station is in Val Gardena, Trentino Alto Adige, at 1,946 m. The map on this page shows the starting point and the route up to 2,201 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.