Drag lift · Arabba · Veneto
Crep de Mont
In Arabba, Veneto, Crep de Mont (drag lift) climbs from 1,704 m to 1,953 m over a line of 1,142 m, with 249 m of vertical drop. Declared capacity reaches 364 people per hour. The ride takes about 10 minutes. The lift entered service in 1954.
- Length
- 1,142 m
- Vertical drop
- 249 m
- Top station
- 1,953 m
- Hourly capacity
- 364 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 1,142 m · Vertical drop 249 m · Average gradient 22%
Drag lift Crep de Mont, Base station 1,704 m, Top station 1,953 m, Length 1,142 m, Vertical drop 249 m, Average gradient 22%.
- Lift type
- Drag lift
- Length
- 1,142 m
- Vertical drop
- 249 m
- Base station
- 1,704 m
- Top station
- 1,953 m
- Average gradient
- 22%
- Hourly capacity
- 364 p/h
- Ride time
- 10 min
- Year built
- 1954
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Season and opening times
- open in summer
- 12 June 2026 - 27 September 2026
www.funiviemarmolada.com · 23 August 2026
Other lifts in Arabba
- Serauta - Punta Rocca Cable car · 3,215 m
- Sass Pordoi Cable car · 2,919 m
- Coston d’Antermoja - Serauta Cable car · 2,871 m
- Vallon Chairlift · 2,521 m
- Funifor Arabba - Portavescovo Cable car · 2,455 m
- Padon Chairlift · 2,416 m
- Sass Becè Chairlift · 2,398 m
- Lezuo Gondola · 2,392 m
Frequently asked questions
How long is Crep de Mont?
The line measures 1,142 m along the route mapped in OpenStreetMap, with 249 m of vertical drop.
How long is the ride on Crep de Mont?
The ride takes about 10 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Crep de Mont cover?
Crep de Mont covers 249 m of vertical drop, from 1,704 m to 1,953 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Crep de Mont carry?
Declared capacity is 364 people per hour. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
Who built Crep de Mont and when?
It has been in service since 1954. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.
When is Crep de Mont open?
Opening times follow the lift calendar of Arabba: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Crep de Mont and how do you get there?
The base station is in Arabba, Veneto, at 1,704 m. The map on this page shows the starting point and the route up to 1,953 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.