Vai al contenuto

Gondola · Madonna di Campiglio · Trentino Alto Adige

Grostè 1 express

Grostè 1 express (gondola) serves Madonna di Campiglio, Trentino Alto Adige. The line measures 3,290 m and covers 426 m of vertical drop. The valley station is at 1,647 m. The top station is at 2,073 m. The ride takes about 12 minutes. Declared capacity is 2,240 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
3,290 m
Vertical drop
426 m
Top station
2,073 m
Hourly capacity
2,240 p/h

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

Published periods

  • Grostè gondola · Summer 2026

    25 Jun - 13 Sept 2026

    Hours: 8:30-17:10

    In August opens at 8:00.

    Source: campigliodolomiti.it · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,647 mTop station2,073 m3,290 m426 m13%

Length 3,290 m · Vertical drop 426 m · Average gradient 13%

Gondola Grostè 1 express, Valley station 1,647 m, Top station 2,073 m, Length 3,290 m, Vertical drop 426 m, Average gradient 13%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Gondola
Length
3,290 m
Vertical drop
426 m
Valley station
1,647 m
Top station
2,073 m
Average gradient
13%
Hourly capacity
2,240 p/h
Seats per vehicle
6
Ride time
12 min
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Madonna di Campiglio

  • Grostè Chairlift · 2,496 m
  • Grostè 2 express Gondola · 2,431 m
  • Rododendro express Chairlift · 2,261 m
  • Patascoss Chairlift · 2,151 m
  • Genziana Express Chairlift · 2,149 m
  • Pradalago Gondola · 2,120 m
  • Pancugolo Chairlift · 2,114 m
  • Fortini Express Gondola · 2,099 m

All lifts in Madonna di Campiglio →

Frequently asked questions

How long is Grostè 1 express?

The line measures 3,290 m along the route mapped in OpenStreetMap, with 426 m of vertical drop.

How long is the ride on Grostè 1 express?

The ride takes about 12 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Grostè 1 express cover?

Grostè 1 express covers 426 m of vertical drop, from 1,647 m to 2,073 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Grostè 1 express carry?

Declared capacity is 2,240 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Grostè 1 express open?

Opening times follow the lift calendar of Madonna di Campiglio: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Grostè 1 express and how do you get there?

The valley station is in Madonna di Campiglio, Trentino Alto Adige, at 1,647 m. The map on this page shows the starting point and the route up to 2,073 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.