Gondola · Racines-Giovo · Trentino Alto Adige
Racines-Giovo
Racines-Giovo (gondola) serves Racines-Giovo, Trentino Alto Adige. The line measures 1,834 m and covers 533 m of vertical drop. The valley station is at 1,291 m. The top station is at 1,824 m. Declared capacity is 2,880 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,834 m
- Vertical drop
- 533 m
- Top station
- 1,824 m
- Hourly capacity
- 2,880 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
Published periods
-
Racines-Giovo gondola · Summer 2026
30 May - 4 Oct 2026
Hours: 8:30-17:00
Source: racines-giovo.it · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 1,834 m · Vertical drop 533 m · Average gradient 29%
Gondola Racines-Giovo, Valley station 1,291 m, Top station 1,824 m, Length 1,834 m, Vertical drop 533 m, Average gradient 29%.
- Lift type
- Gondola
- Length
- 1,834 m
- Vertical drop
- 533 m
- Valley station
- 1,291 m
- Top station
- 1,824 m
- Average gradient
- 29%
- Hourly capacity
- 2,880 p/h
- Seats per vehicle
- 8
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Racines-Giovo
- 6CLD/8MGD Panorama Hybrid lift · 2,140 m
- Saxner Chairlift · 2,136 m
- Malga Rinner Chairlift · 2,087 m
- Enzian Chairlift · 2,062 m
- Malga Calice Chairlift · 1,995 m
- Stock Chairlift · 1,969 m
- Wastenegg Chairlift · 1,966 m
- Wasserfalleralm Chairlift · 1,879 m
Frequently asked questions
How long is Racines-Giovo?
The line measures 1,834 m along the route mapped in OpenStreetMap, with 533 m of vertical drop.
What vertical drop does Racines-Giovo cover?
Racines-Giovo covers 533 m of vertical drop, from 1,291 m to 1,824 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Racines-Giovo carry?
Declared capacity is 2,880 people per hour, with 8 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Racines-Giovo open?
Opening times follow the lift calendar of Racines-Giovo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Racines-Giovo and how do you get there?
The valley station is in Racines-Giovo, Trentino Alto Adige, at 1,291 m. The map on this page shows the starting point and the route up to 1,824 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.