Cable car · Macugnaga · Piemonte
Funivia Alpe Bill-Passo Moro
Funivia Alpe Bill-Passo Moro (cable car) serves Macugnaga, Piemonte. The line measures 2,460 m and covers 1,104 m of vertical drop. The base station is at 1,701 m. The top station is at 2,805 m. The ride takes about 6.1 minutes. Declared capacity is 410 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 2,460 m
- Vertical drop
- 1,104 m
- Top station
- 2,805 m
- Hourly capacity
- 410 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 2,460 m · Vertical drop 1,104 m · Average gradient 45%
Cable car Funivia Alpe Bill-Passo Moro, Base station 1,701 m, Top station 2,805 m, Length 2,460 m, Vertical drop 1,104 m, Average gradient 45%.
- Lift type
- Cable car
- Length
- 2,460 m
- Vertical drop
- 1,104 m
- Base station
- 1,701 m
- Top station
- 2,805 m
- Average gradient
- 45%
- Hourly capacity
- 410 p/h
- Seats per vehicle
- 50
- Ride time
- 6.1 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Macugnaga
- San Pietro Drag lift · 2,874 m
- Tappeto Magic carpet · 2,817 m
- Ruppenstein Chairlift · 2,803 m
- Seggiovia Alpe Burki - Belvedere Chairlift · 1,908 m
- Funivia Macugnaga-Alpe Bill Cable car · 1,701 m
- Burki 3° Drag lift · 1,691 m
- Seggiovia Pecetto - Alpe Burki Chairlift · 1,618 m
- Partenza Pecetto Magic carpet · 1,384 m
Frequently asked questions
How long is Funivia Alpe Bill-Passo Moro?
The line measures 2,460 m along the route mapped in OpenStreetMap, with 1,104 m of vertical drop.
How long is the ride on Funivia Alpe Bill-Passo Moro?
The ride takes about 6.1 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Funivia Alpe Bill-Passo Moro cover?
Funivia Alpe Bill-Passo Moro covers 1,104 m of vertical drop, from 1,701 m to 2,805 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Funivia Alpe Bill-Passo Moro carry?
Declared capacity is 410 people per hour, with 50 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Funivia Alpe Bill-Passo Moro open?
Opening times follow the lift calendar of Macugnaga: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Funivia Alpe Bill-Passo Moro and how do you get there?
The base station is in Macugnaga, Piemonte, at 1,701 m. The map on this page shows the starting point and the route up to 2,805 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.