Vai al contenuto

Cable car · Passo San Pellegrino · Trentino Alto Adige

Col Margherita

Col Margherita (cable car) serves Passo San Pellegrino, Trentino Alto Adige. The line measures 1,256 m and covers 591 m of vertical drop. The base station is at 1,874 m. The top station is at 2,465 m. The ride takes about 3 minutes. Declared capacity is 1,330 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,256 m
Vertical drop
591 m
Top station
2,465 m
Hourly capacity
1,330 p/h

Technical data

Base station1,874 mTop station2,465 m1,256 m591 m47%

Length 1,256 m · Vertical drop 591 m · Average gradient 47%

Cable car Col Margherita, Base station 1,874 m, Top station 2,465 m, Length 1,256 m, Vertical drop 591 m, Average gradient 47%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Cable car
Length
1,256 m
Vertical drop
591 m
Base station
1,874 m
Top station
2,465 m
Average gradient
47%
Hourly capacity
1,330 p/h
Seats per vehicle
96
Ride time
3 min
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Passo San Pellegrino

  • Lago Cavia - Col Margherita Chairlift · 2,514 m
  • Costabella Chairlift · 2,272 m
  • Saline-Laresei Chairlift · 2,265 m
  • Gigante Chairlift · 2,258 m
  • Le Buse - Laresei Chairlift · 2,230 m
  • Lago Cavia - Laresei Chairlift · 2,196 m
  • Funivia ENEL Lago Cavia Cable car · 2,091 m
  • Chiesetta 1 Drag lift · 2,020 m

All lifts in Passo San Pellegrino →

Frequently asked questions

How long is Col Margherita?

The line measures 1,256 m along the route mapped in OpenStreetMap, with 591 m of vertical drop.

How long is the ride on Col Margherita?

The ride takes about 3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Col Margherita cover?

Col Margherita covers 591 m of vertical drop, from 1,874 m to 2,465 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Col Margherita carry?

Declared capacity is 1,330 people per hour, with 96 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Col Margherita open?

Opening times follow the lift calendar of Passo San Pellegrino: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Col Margherita and how do you get there?

The base station is in Passo San Pellegrino, Trentino Alto Adige, at 1,874 m. The map on this page shows the starting point and the route up to 2,465 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.