Cable car · Pila · Valle d'Aosta
Gorraz - Grand Grimod
Gorraz - Grand Grimod (cable car) serves Pila, Valle d'Aosta. The line measures 1,807 m and covers 357 m of vertical drop. The base station is at 1,860 m. The top station is at 2,217 m. The ride takes about 6 minutes. Declared capacity is 914 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,807 m
- Vertical drop
- 357 m
- Top station
- 2,217 m
- Hourly capacity
- 914 p/h
Technical data
Length 1,807 m · Vertical drop 357 m · Average gradient 20%
Cable car Gorraz - Grand Grimod, Base station 1,860 m, Top station 2,217 m, Length 1,807 m, Vertical drop 357 m, Average gradient 20%.
- Lift type
- Cable car
- Length
- 1,807 m
- Vertical drop
- 357 m
- Base station
- 1,860 m
- Top station
- 2,217 m
- Average gradient
- 20%
- Hourly capacity
- 914 p/h
- Seats per vehicle
- 80
- Ride time
- 6 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Pila
- Couis - Platta de Grévon Gondola · 2,694 m
- Couis 2 Chairlift · 2,605 m
- Leissé Chairlift · 2,345 m
- Grimondet Chairlift · 2,306 m
- Chamolé Chairlift · 2,303 m
- La Nouva Chairlift · 2,245 m
- Grimod Chairlift · 2,243 m
- Gorraz - Couis Gondola · 2,160 m
Frequently asked questions
How long is Gorraz - Grand Grimod?
The line measures 1,807 m along the route mapped in OpenStreetMap, with 357 m of vertical drop.
How long is the ride on Gorraz - Grand Grimod?
The ride takes about 6 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Gorraz - Grand Grimod cover?
Gorraz - Grand Grimod covers 357 m of vertical drop, from 1,860 m to 2,217 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Gorraz - Grand Grimod carry?
Declared capacity is 914 people per hour, with 80 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Gorraz - Grand Grimod open?
Opening times follow the lift calendar of Pila: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Gorraz - Grand Grimod and how do you get there?
The base station is in Pila, Valle d'Aosta, at 1,860 m. The map on this page shows the starting point and the route up to 2,217 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.