Cable car · Piani di Bobbio · Lombardia
Moggio - Artavaggio
Moggio - Artavaggio is a cable car in Piani di Bobbio, Lombardia. It links the valley station at 897 m with the top station at 1,620 m. The line measures 2,504 m and covers 723 m of vertical drop. The ride takes about 6 minutes. Declared capacity is 380 people per hour. The lift was built by Ceretti. It has been in service since 1961.
- Length
- 2,504 m
- Vertical drop
- 723 m
- Top station
- 1,620 m
- Hourly capacity
- 380 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
Published periods
-
Moggio - Piani di Artavaggio cable car · Summer 2026
9 Jun - 6 Sept 2026
Only: Mon, Wed, Thu, Fri, Sat, Sun
Extra days: 1 Sept
Hours: 8:30-12:15, 13:30-17:00
Closed on Tuesdays.
Source: pianidibobbio.com · checked on 23 September 2026
-
Moggio - Piani di Artavaggio cable car · Autumn 2026
7 Sept - 4 Oct 2026; 5 Dec - 31 Dec 2026
Only: Mon, Wed, Thu, Fri, Sat, Sun
Extra days: 8 Sept
Hours: 8:30-12:15, 13:30-17:00
Closed on Tuesdays. Out of service for major maintenance from Monday 5 October to Friday 4 December 2026.
Source: pianidibobbio.com · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 2,504 m · Vertical drop 723 m · Average gradient 29%
Cable car Moggio - Artavaggio, Valley station 897 m, Top station 1,620 m, Length 2,504 m, Vertical drop 723 m, Average gradient 29%.
- Lift type
- Cable car
- Length
- 2,504 m
- Vertical drop
- 723 m
- Valley station
- 897 m
- Top station
- 1,620 m
- Average gradient
- 29%
- Hourly capacity
- 380 p/h
- Seats per vehicle
- 46
- Ride time
- 6 min
- Manufacturer
- Ceretti
- Year built
- 1961
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Piani di Bobbio
- Salmurano Drag lift · 1,959 m
- Camosci Chairlift · 1,861 m
- Unnamed lift Magic carpet · 1,851 m
- Pescegallo Chairlift · 1,829 m
- Nuova Orscellera Chairlift · 1,798 m
- Funivia Enel Gerola Trona Cable car · 1,780 m
- Nuova Ongania Chairlift · 1,771 m
- Fortino Chairlift · 1,728 m
Frequently asked questions
How long is Moggio - Artavaggio?
The line measures 2,504 m along the route mapped in OpenStreetMap, with 723 m of vertical drop.
How long is the ride on Moggio - Artavaggio?
The ride takes about 6 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Moggio - Artavaggio cover?
Moggio - Artavaggio covers 723 m of vertical drop, from 897 m to 1,620 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Moggio - Artavaggio carry?
Declared capacity is 380 people per hour, with 46 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
Who built Moggio - Artavaggio and when?
The lift was built by Ceretti. It has been in service since 1961. The data comes from the lift's OpenStreetMap tags: if you have the official technical sheet, please send it to us.
When is Moggio - Artavaggio open?
Opening times follow the lift calendar of Piani di Bobbio: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Moggio - Artavaggio and how do you get there?
The valley station is in Piani di Bobbio, Lombardia, at 897 m. The map on this page shows the starting point and the route up to 1,620 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.