Vai al contenuto

Cable car · Alagna Valsesia · Piemonte

Funivia Passo dei Salati-Punta Indren

Funivia Passo dei Salati-Punta Indren is a cable car in Alagna Valsesia, Piemonte. It links the base station at 2,871 m with the top station at 3,264 m. The line measures 1,548 m and covers 393 m of vertical drop. The ride takes about 2.5 minutes. Declared capacity is 740 people per hour. The lift was built by Doppelmayr.

Length
1,548 m
Vertical drop
393 m
Top station
3,264 m
Hourly capacity
740 p/h

Photos

SemudobiaCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station2,871 mTop station3,264 m1,548 m393 m25%

Length 1,548 m · Vertical drop 393 m · Average gradient 25%

Cable car Funivia Passo dei Salati-Punta Indren, Base station 2,871 m, Top station 3,264 m, Length 1,548 m, Vertical drop 393 m, Average gradient 25%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Cable car
Length
1,548 m
Vertical drop
393 m
Base station
2,871 m
Top station
3,264 m
Average gradient
25%
Hourly capacity
740 p/h
Seats per vehicle
60
Ride time
2.5 min
Manufacturer
Doppelmayr

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Alagna Valsesia

  • Gabiet - Passo dei Salati Gondola · 2,993 m
  • Cimalegna-Passo Salati Chairlift · 2,983 m
  • Pianalunga - Cimalegna - Salati Cable car · 2,978 m
  • Pianalunga - Bocchetta Chairlift · 2,394 m
  • Gabiet - Lago Chairlift · 2,386 m
  • Alagna - Pianalunga Gondola · 2,053 m
  • Pianalunga Magic carpet · 2,044 m
  • Wold 2 Drag lift · 1,330 m

All lifts in Alagna Valsesia →

Frequently asked questions

How long is Funivia Passo dei Salati-Punta Indren?

The line measures 1,548 m along the route mapped in OpenStreetMap, with 393 m of vertical drop.

How long is the ride on Funivia Passo dei Salati-Punta Indren?

The ride takes about 2.5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Funivia Passo dei Salati-Punta Indren cover?

Funivia Passo dei Salati-Punta Indren covers 393 m of vertical drop, from 2,871 m to 3,264 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Funivia Passo dei Salati-Punta Indren carry?

Declared capacity is 740 people per hour, with 60 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Funivia Passo dei Salati-Punta Indren and when?

The lift was built by Doppelmayr. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Funivia Passo dei Salati-Punta Indren open?

Opening times follow the lift calendar of Alagna Valsesia: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Funivia Passo dei Salati-Punta Indren and how do you get there?

The base station is in Alagna Valsesia, Piemonte, at 2,871 m. The map on this page shows the starting point and the route up to 3,264 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.