Vai al contenuto

Cable car · Bormio · Lombardia

Passo Stelvio - Trincerone

Passo Stelvio - Trincerone is a cable car in Bormio, Lombardia. It links the base station at 2,773 m with the top station at 3,001 m. The line measures 1,134 m and covers 228 m of vertical drop. The ride takes about 2 minutes. Declared capacity is 600 people per hour. The lift was built by Hölzl. It has been in service since 1966.

Length
1,134 m
Vertical drop
228 m
Top station
3,001 m
Hourly capacity
600 p/h

Photos

Carsten WieheCC BY 3.0 · Wikimedia Commons
Amcs1983CC BY-SA 3.0 · Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station2,773 mTop station3,001 m1,134 m228 m20%

Length 1,134 m · Vertical drop 228 m · Average gradient 20%

Cable car Passo Stelvio - Trincerone, Base station 2,773 m, Top station 3,001 m, Length 1,134 m, Vertical drop 228 m, Average gradient 20%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Cable car
Length
1,134 m
Vertical drop
228 m
Base station
2,773 m
Top station
3,001 m
Average gradient
20%
Hourly capacity
600 p/h
Seats per vehicle
50
Ride time
2 min
Manufacturer
Hölzl
Year built
1966

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Season and opening times

open in summer
4 July 2026 - 6 September 2026

www.bormioski.eu · 24 August 2026

Other lifts in Bormio

  • Payer Drag lift · 3,340 m
  • Geister II Drag lift · 3,332 m
  • Cristallo Drag lift · 3,315 m
  • Geister I Drag lift · 3,175 m
  • Unnamed lift Magic carpet · 3,155 m
  • Unnamed lift Magic carpet · 3,155 m
  • Trincerone - Livrio Cable car · 3,139 m
  • Bormio 2000 - Cima Bianca Cable car · 2,995 m

All lifts in Bormio →

Frequently asked questions

How long is Passo Stelvio - Trincerone?

The line measures 1,134 m along the route mapped in OpenStreetMap, with 228 m of vertical drop.

How long is the ride on Passo Stelvio - Trincerone?

The ride takes about 2 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Passo Stelvio - Trincerone cover?

Passo Stelvio - Trincerone covers 228 m of vertical drop, from 2,773 m to 3,001 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Passo Stelvio - Trincerone carry?

Declared capacity is 600 people per hour, with 50 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Passo Stelvio - Trincerone and when?

The lift was built by Hölzl. It has been in service since 1966. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Passo Stelvio - Trincerone open?

Opening times follow the lift calendar of Bormio: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Passo Stelvio - Trincerone and how do you get there?

The base station is in Bormio, Lombardia, at 2,773 m. The map on this page shows the starting point and the route up to 3,001 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.