Vai al contenuto

Cable car · Champoluc · Valle d'Aosta

Stafal - Sant'Anna

Stafal - Sant'Anna is a cable car in Champoluc, Valle d'Aosta. It links the valley station at 1,820 m with the top station at 2,171 m. The line measures 661 m and covers 351 m of vertical drop. The ride takes about 1.4 minutes. Declared capacity is 1,000 people per hour. The lift was built by Agudio.

Length
661 m
Vertical drop
351 m
Top station
2,171 m
Hourly capacity
1,000 p/h

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Champoluc - Crest gondola · Summer 2026

    20 Jun - 13 Sept 2026

    Hours: 8:00-13:00, 14:15-17:50; evening runs 19:30 and 22:30 (September weekends 22:30 only)

    Source: monterosaski.eu · checked on 23 September 2026

  • Frachey - Alpe Ciarcerio funicular · Summer 2026

    20 Jun - 13 Sept 2026

    Hours: 8:00-13:00, 14:15-17:50

    Source: monterosaski.eu · checked on 23 September 2026

  • Crest - Alpe Ostafa gondola · Summer 2026

    11 Jul - 30 Aug 2026

    Extra days: 4 Jul, 5 Jul

    Hours: 8:15-13:00, 14:15-17:30

    Source: monterosaski.eu · checked on 23 September 2026

  • Alpe Mandria and Bettaforca chairlifts · Summer 2026

    1 Aug - 30 Aug 2026

    Extra days: 4 Jul, 5 Jul, 11 Jul, 12 Jul, 18 Jul, 19 Jul, 25 Jul, 26 Jul

    Source: monterosaski.eu · checked on 23 September 2026

  • Champoluc - Crest gondola (public transport) · Autumn 2026

    14 Sept - 30 Sept 2026; 31 Oct - 27 Nov 2026

    Hours: Weekdays scheduled runs 6:40-17:00, on Mondays also at 18:20 (Monday 2/11 first run 7:55); weekends 7:55-11:50, 13:00-17:00

    Closed for maintenance from 1 to 30 October 2026. Winter timetable from 28 November.

    Source: drive.google.com · checked on 23 September 2026

  • Champoluc · Winter 2026/27

    28 Nov 2026 - 11 Apr 2027

    Monterosa Ski 3 Valleys area (Champoluc-Frachey, Staffal, Alagna), snow conditions permitting.

    Source: monterosaski.eu · checked on 23 September 2026

  • Antagnod · Winter 2026/27

    19 Dec 2026 - 14 Mar 2027; 26 Mar - 29 Mar 2027

    Extra days: 5 Dec, 6 Dec, 7 Dec, 8 Dec, 12 Dec, 13 Dec, 20 Mar, 21 Mar

    Source: monterosaski.eu · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,820 mTop station2,171 m661 m351 m53%

Length 661 m · Vertical drop 351 m · Average gradient 53%

Cable car Stafal - Sant'Anna, Valley station 1,820 m, Top station 2,171 m, Length 661 m, Vertical drop 351 m, Average gradient 53%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Cable car
Length
661 m
Vertical drop
351 m
Valley station
1,820 m
Top station
2,171 m
Average gradient
53%
Hourly capacity
1,000 p/h
Seats per vehicle
70
Ride time
1.4 min
Manufacturer
Agudio
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Champoluc

  • Sant'Anna - Colle Betta Chairlift · 2,737 m
  • Alpe Ostafa - Colle Sarezza II Chairlift · 2,693 m
  • Bettaforca Chairlift · 2,681 m
  • Crest - Alpe Ostafa III Gondola · 2,433 m
  • Alpe Mandria Chairlift · 2,425 m
  • Lago Ciarcerio - Belvedere Chairlift · 2,368 m
  • Antagnod - Pian Pera Chairlift · 2,315 m
  • Stafal - Gabiet Gondola · 2,303 m

All lifts in Champoluc →

Frequently asked questions

How long is Stafal - Sant'Anna?

The line measures 661 m along the route mapped in OpenStreetMap, with 351 m of vertical drop.

How long is the ride on Stafal - Sant'Anna?

The ride takes about 1.4 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Stafal - Sant'Anna cover?

Stafal - Sant'Anna covers 351 m of vertical drop, from 1,820 m to 2,171 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Stafal - Sant'Anna carry?

Declared capacity is 1,000 people per hour, with 70 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Stafal - Sant'Anna and when?

The lift was built by Agudio. The data comes from the lift's OpenStreetMap tags: if you have the official technical sheet, please send it to us.

When is Stafal - Sant'Anna open?

Opening times follow the lift calendar of Champoluc: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Stafal - Sant'Anna and how do you get there?

The valley station is in Champoluc, Valle d'Aosta, at 1,820 m. The map on this page shows the starting point and the route up to 2,171 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.