Vai al contenuto

Chairlift · Valmalenco · Lombardia

Alpe Palú - Cima Motta

In Valmalenco, Lombardia, Alpe Palú - Cima Motta (chairlift) climbs from 1,989 m to 2,311 m over a line of 1,387 m, with 322 m of vertical drop. Each vehicle carries 4 people. Declared capacity reaches 2,000 people per hour. The ride takes about 5 minutes. The manufacturer is LEITNER. The lift entered service in 2016.

Length
1,387 m
Vertical drop
322 m
Top station
2,311 m
Hourly capacity
2,000 p/h

Technical data

Base station1,989 mTop station2,311 m1,387 m322 m23%

Length 1,387 m · Vertical drop 322 m · Average gradient 23%

Chairlift Alpe Palú - Cima Motta, Base station 1,989 m, Top station 2,311 m, Length 1,387 m, Vertical drop 322 m, Average gradient 23%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,387 m
Vertical drop
322 m
Base station
1,989 m
Top station
2,311 m
Average gradient
23%
Hourly capacity
2,000 p/h
Seats per vehicle
4
Ride time
5 min
Manufacturer
LEITNER
Year built
2016
  • Bubble cover
  • Bike transport

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Valmalenco

  • Bocchel del Torno Chairlift · 2,368 m
  • Scerscen - Cima Motta Chairlift · 2,313 m
  • Del Dosso Chairlift · 2,088 m
  • Snow Eagle Cable car · 2,053 m
  • Baby Magic carpet · 2,014 m
  • Baby 2 Magic carpet · 2,014 m
  • Baby Bernina Chairlift · 2,005 m
  • Pedrana - Barchi - Palù Chairlift · 1,989 m

All lifts in Valmalenco →

Frequently asked questions

How long is Alpe Palú - Cima Motta?

The line measures 1,387 m along the route mapped in OpenStreetMap, with 322 m of vertical drop.

How long is the ride on Alpe Palú - Cima Motta?

The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Alpe Palú - Cima Motta cover?

Alpe Palú - Cima Motta covers 322 m of vertical drop, from 1,989 m to 2,311 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Alpe Palú - Cima Motta carry?

Declared capacity is 2,000 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Alpe Palú - Cima Motta and when?

The lift was built by LEITNER. It has been in service since 2016. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Alpe Palú - Cima Motta open?

Opening times follow the lift calendar of Valmalenco: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Alpe Palú - Cima Motta and how do you get there?

The base station is in Valmalenco, Lombardia, at 1,989 m. The map on this page shows the starting point and the route up to 2,311 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.