Vai al contenuto

Chairlift · Courmayeur Mont Blanc · Valle d'Aosta

Bertolini

Bertolini (chairlift) serves Courmayeur Mont Blanc, Valle d'Aosta. The line measures 1,395 m and covers 481 m of vertical drop. The valley station is at 1,763 m. The top station is at 2,244 m. Declared capacity is 1,028 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,395 m
Vertical drop
481 m
Top station
2,244 m
Hourly capacity
1,028 p/h

Photos

RémihCC BY-SA 4.0 · Wikimedia Commons
RémihCC BY-SA 4.0 · Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Skyway Monte Bianco · Summer 2026

    23 May - 13 Sept 2026

    Italian side. The Panoramic Mont Blanc to the Aiguille du Midi has its own calendar.

    Source: lovevda.it · checked on 23 September 2026

  • Dolonne gondola, Val Veny cable car, Zerotta chairlift · Summer 2026

    27 Jun - 30 Aug 2026

    Hours: Dolonne 9:30-17:50, Val Veny 9:30-17:20, Zerotta 8:30-17:20

    Official sources disagree: The regional PDF gives a 17:50 last descent for the Val Veny cable car and a 9:30 start for the Zerotta chairlift.

    Source: courmayeur-montblanc.com · checked on 23 September 2026

  • Skyway Monte Bianco · Autumn 2026

    14 Sept - 15 Nov 2026

    Hours: First ascent 8:30, last descent 15:30 (16:30 at weekends)

    Closed from 16 November to 4 December 2026. The Panoramic Mont Blanc has its own calendar.

    Source: montebianco.com · checked on 23 September 2026

  • Courmayeur Mont Blanc · Winter 2026/27

    Dates planned by the operator

    28 Nov 2026 - 11 Apr 2027

    Hours: Mon-Fri 8:45-17:00; weekends and holidays 8:25-17:00

    Opening given as planned. Holiday hours also on 5-8 December, 25 December-10 January and 6 February-7 March (periods being updated).

    Source: courmayeur-montblanc.com · checked on 23 September 2026

  • Skyway Monte Bianco · Winter 2026/27

    5 Dec 2026 - 18 Apr 2027

    Hours: First ascent 8:30, last descent 15:30; 16:30 at weekends, on 7/12, 8/12 and 29/3, 27/12-6/1, 7-11/1 and 30/1-14/2

    Official sources disagree: The official table is headed "2025/2026" but its rows give 2026 and 2027 dates.

    Source: montebianco.com · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,763 mTop station2,244 m1,395 m481 m34%

Length 1,395 m · Vertical drop 481 m · Average gradient 34%

Chairlift Bertolini, Valley station 1,763 m, Top station 2,244 m, Length 1,395 m, Vertical drop 481 m, Average gradient 34%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,395 m
Vertical drop
481 m
Valley station
1,763 m
Top station
2,244 m
Average gradient
34%
Hourly capacity
1,028 p/h
Seats per vehicle
4

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Courmayeur Mont Blanc

  • Skyway Monte Bianco Cable car · 3,378 m
  • Arp Cable car · 2,726 m
  • Youla Cable car · 2,597 m
  • Testa Bassa Chairlift · 2,453 m
  • Plan de la Gabba Chairlift · 2,292 m
  • Le Greye Drag lift · 2,265 m
  • Aretù Chairlift · 2,244 m
  • Checrouit Gondola · 2,243 m

All lifts in Courmayeur Mont Blanc →

Frequently asked questions

How long is Bertolini?

The line measures 1,395 m along the route mapped in OpenStreetMap, with 481 m of vertical drop.

What vertical drop does Bertolini cover?

Bertolini covers 481 m of vertical drop, from 1,763 m to 2,244 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Bertolini carry?

Declared capacity is 1,028 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Bertolini open?

Opening times follow the lift calendar of Courmayeur Mont Blanc: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Bertolini and how do you get there?

The valley station is in Courmayeur Mont Blanc, Valle d'Aosta, at 1,763 m. The map on this page shows the starting point and the route up to 2,244 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.