Vai al contenuto

Chairlift · Bormio · Lombardia

Bormio 2000 - Pian dei Larici

In Bormio, Lombardia, Bormio 2000 - Pian dei Larici (chairlift) climbs from 1,928 m to 2,229 m over a line of 915 m, with 301 m of vertical drop. Each vehicle carries 3 people. Declared capacity reaches 1,800 people per hour. The ride takes about 9 minutes. The manufacturer is Doppelmayr. The lift entered service in 1995.

Length
915 m
Vertical drop
301 m
Top station
2,229 m
Hourly capacity
1,800 p/h

Openings by the official calendar

Today's status is worked out in your browser: the published periods are below.

We have no official calendar for this lift: below is the resort's, which may not apply to every lift.

Published periods

  • Stelvio Pass (summer skiing) · Summer 2026

    Dates planned by the operator

    30 May - 1 Nov 2026

    Hours: 7:00-16:00

    Dates given as "planned" by the operator SIFAS: lifts expected to close on Sunday 1 November 2026. Also depends on the pass road being open.

    Source: passostelvio.eu · checked on 23 September 2026

  • Bormio · Summer 2026

    4 Jul - 6 Sept 2026

    Hours: Bormio - Bormio 2000 cableway 9:00-17:30; Bormio 2000 - Cima Bianca 9:00-12:00, 13:00-17:00

    Summer season ended on 6 September.

    Source: bormioski.eu · checked on 23 September 2026

  • Valdidentro, Isolaccia - Pian della Mota gondola (Cima Piazzi) · Summer 2026

    4 Jul - 6 Sept 2026

    Only: Tue, Wed, Thu, Fri, Sat, Sun

    Extra days: 10 Aug, 17 Aug

    Summer season ended on 6 September. Closed on Mondays, open exceptionally on Monday 10 and 17 August.

    Source: cimapiazzi.eu · checked on 23 September 2026

  • Bormio 2000 - Cimino chairlift · Summer 2026

    18 Jul - 6 Sept 2026

    Only: Tue, Wed, Thu, Fri, Sat, Sun

    Hours: 9:30-16:30

    Closed on Mondays. Summer season ended on 6 September.

    Source: bormioski.eu · checked on 23 September 2026

  • Bormio · Winter 2026/27

    4 Dec 2026 - 11 Apr 2027

    Hours: Bormio - Bormio 2000 gondola 8:30-17:00 (last ride up 16:30); Cima Bianca cable car 8:30-16:45 (last ride up 16:00)

    Source: bormioski.eu · checked on 23 September 2026

This is not live status: check the official site before you go up.

Technical data

Valley station1,928 mTop station2,229 m915 m301 m33%

Length 915 m · Vertical drop 301 m · Average gradient 33%

Chairlift Bormio 2000 - Pian dei Larici, Valley station 1,928 m, Top station 2,229 m, Length 915 m, Vertical drop 301 m, Average gradient 33%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
915 m
Vertical drop
301 m
Valley station
1,928 m
Top station
2,229 m
Average gradient
33%
Hourly capacity
1,800 p/h
Seats per vehicle
3
Ride time
9 min
Manufacturer
Doppelmayr
Year built
1995

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Bormio

  • Payer Drag lift · 3,340 m
  • Geister II Drag lift · 3,332 m
  • Cristallo Drag lift · 3,315 m
  • Geister I Drag lift · 3,175 m
  • Unnamed lift Magic carpet · 3,155 m
  • Unnamed lift Magic carpet · 3,155 m
  • Trincerone - Livrio Cable car · 3,139 m
  • Passo Stelvio - Trincerone Cable car · 3,001 m

All lifts in Bormio →

Frequently asked questions

How long is Bormio 2000 - Pian dei Larici?

The line measures 915 m along the route mapped in OpenStreetMap, with 301 m of vertical drop.

How long is the ride on Bormio 2000 - Pian dei Larici?

The ride takes about 9 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Bormio 2000 - Pian dei Larici cover?

Bormio 2000 - Pian dei Larici covers 301 m of vertical drop, from 1,928 m to 2,229 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Bormio 2000 - Pian dei Larici carry?

Declared capacity is 1,800 people per hour, with 3 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Bormio 2000 - Pian dei Larici and when?

The lift was built by Doppelmayr. It has been in service since 1995. The data comes from the lift's OpenStreetMap tags: if you have the official technical sheet, please send it to us.

When is Bormio 2000 - Pian dei Larici open?

Opening times follow the lift calendar of Bormio: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Bormio 2000 - Pian dei Larici and how do you get there?

The valley station is in Bormio, Lombardia, at 1,928 m. The map on this page shows the starting point and the route up to 2,229 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.