Chairlift · Pontedilegno-Tonale · Lombardia
Cadì Sit
Cadì Sit (chairlift) serves Pontedilegno-Tonale, Lombardia. The line measures 691 m and covers 176 m of vertical drop. The valley station is at 1,881 m. The top station is at 2,057 m. The ride takes about 5 minutes. Declared capacity is 1,800 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 691 m
- Vertical drop
- 176 m
- Top station
- 2,057 m
- Hourly capacity
- 1,800 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
We have no official calendar for this lift: below is the resort's, which may not apply to every lift.
Published periods
-
Paradiso and Presena gondolas · Summer 2026
20 Jun - 20 Sept 2026
Hours: Paradiso 8:30-16:45; Presena 8:45-16:15. From 6 September, on weekdays, lunch break 13:00-14:00 (never at weekends)
Summer season ended on 20 September. Winter opening date for the glacier not yet published.
Source: pontedilegnotonale.com · checked on 23 September 2026
-
Colonia Vigili - Tonale gondola · Summer 2026
20 Jun - 13 Sept 2026
Hours: 8:30-17:00
Source: pontedilegnotonale.com · checked on 23 September 2026
-
Nigritella and Contrabbandieri chairlifts · Summer 2026
4 Jul - 6 Sept 2026
Hours: Nigritella 8:30-16:45; Contrabbandieri 8:45-16:30
Source: pontedilegnotonale.com · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 691 m · Vertical drop 176 m · Average gradient 25%
Chairlift Cadì Sit, Valley station 1,881 m, Top station 2,057 m, Length 691 m, Vertical drop 176 m, Average gradient 25%.
- Lift type
- Chairlift
- Length
- 691 m
- Vertical drop
- 176 m
- Valley station
- 1,881 m
- Top station
- 2,057 m
- Average gradient
- 25%
- Hourly capacity
- 1,800 p/h
- Seats per vehicle
- 3
- Ride time
- 5 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Pontedilegno-Tonale
- Ghiacciaio Presena Gondola · 2,943 m
- Ghiacciaio Presena Gondola · 2,721 m
- Seggiovia Passo Contrabbandieri Chairlift · 2,569 m
- Paradiso Gondola · 2,567 m
- Bleis Chairlift · 2,505 m
- Seggiovia Malga Valbiolo Chairlift · 2,430 m
- Unnamed lift Magic carpet · 2,244 m
- Alpe Alta Chairlift · 2,233 m
Frequently asked questions
How long is Cadì Sit?
The line measures 691 m along the route mapped in OpenStreetMap, with 176 m of vertical drop.
How long is the ride on Cadì Sit?
The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Cadì Sit cover?
Cadì Sit covers 176 m of vertical drop, from 1,881 m to 2,057 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Cadì Sit carry?
Declared capacity is 1,800 people per hour, with 3 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Cadì Sit open?
Opening times follow the lift calendar of Pontedilegno-Tonale: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Cadì Sit and how do you get there?
The valley station is in Pontedilegno-Tonale, Lombardia, at 1,881 m. The map on this page shows the starting point and the route up to 2,057 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.