Chairlift · Passo San Pellegrino · Trentino Alto Adige
Campigol
Campigol (chairlift) serves Passo San Pellegrino, Trentino Alto Adige. The line measures 519 m and covers 90 m of vertical drop. The valley station is at 1,900 m. The top station is at 1,990 m. The ride takes about 5 minutes. Declared capacity is 1,600 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 519 m
- Vertical drop
- 90 m
- Top station
- 1,990 m
- Hourly capacity
- 1,600 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
We have no official calendar for this lift: below is the resort's, which may not apply to every lift.
Published periods
-
Col Margherita cable car · Summer 2026
20 Jun - 20 Sept 2026
Hours: 9:00-13:20 and 14:00-17:30
Source: skiareasanpellegrino.it · checked on 23 September 2026
-
Costabella chairlift · Summer 2026
20 Jun - 20 Sept 2026
Hours: 8:30-12:50 and 14:00-17:30
Source: skiareasanpellegrino.it · checked on 23 September 2026
-
Passo San Pellegrino - Falcade ski area · Winter 2026/27
Dates planned by the operator
4 Dec 2026 - 4 Apr 2027
Season window from the Dolomiti Superski data shown on fassa.com, identical for every ski area: not an announced opening date for this area. To be re-checked when the operator announces openings.
Source: fassa.com · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 519 m · Vertical drop 90 m · Average gradient 17%
Chairlift Campigol, Valley station 1,900 m, Top station 1,990 m, Length 519 m, Vertical drop 90 m, Average gradient 17%.
- Lift type
- Chairlift
- Length
- 519 m
- Vertical drop
- 90 m
- Valley station
- 1,900 m
- Top station
- 1,990 m
- Average gradient
- 17%
- Hourly capacity
- 1,600 p/h
- Seats per vehicle
- 4
- Ride time
- 5 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Passo San Pellegrino
- Lago Cavia - Col Margherita Chairlift · 2,514 m
- Col Margherita Cable car · 2,465 m
- Costabella Chairlift · 2,272 m
- Saline-Laresei Chairlift · 2,265 m
- Gigante Chairlift · 2,258 m
- Le Buse - Laresei Chairlift · 2,230 m
- Lago Cavia - Laresei Chairlift · 2,196 m
- Funivia ENEL Lago Cavia Cable car · 2,091 m
Frequently asked questions
How long is Campigol?
The line measures 519 m along the route mapped in OpenStreetMap, with 90 m of vertical drop.
How long is the ride on Campigol?
The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Campigol cover?
Campigol covers 90 m of vertical drop, from 1,900 m to 1,990 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Campigol carry?
Declared capacity is 1,600 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Campigol open?
Opening times follow the lift calendar of Passo San Pellegrino: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Campigol and how do you get there?
The valley station is in Passo San Pellegrino, Trentino Alto Adige, at 1,900 m. The map on this page shows the starting point and the route up to 1,990 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.