Chairlift · Val di Fassa · Trentino Alto Adige
Cima Uomo
Cima Uomo (chairlift) serves Val di Fassa, Trentino Alto Adige. The line measures 700 m and covers 212 m of vertical drop. The valley station is at 2,258 m. The top station is at 2,470 m. The ride takes about 5.3 minutes. Declared capacity is 1,790 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 700 m
- Vertical drop
- 212 m
- Top station
- 2,470 m
- Hourly capacity
- 1,790 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Openings by the official calendar
Today's status is worked out in your browser: the published periods are below.
We have no official calendar for this lift: below is the resort's, which may not apply to every lift.
Published periods
-
Sass Pordoi cable car · Summer 2026
14 May - 1 Nov 2026
Hours: 9:00-17:00
From 19 Oct closes at 16:30.
Source: sasspordoi.it · checked on 23 September 2026
-
Vigo - Ciampedie cable car · Summer 2026
30 May - 4 Oct 2026
From 14 Sep: 8:30-13:00 and 14:00-18:00.
Source: valdifassalift.it · checked on 23 September 2026
-
Campitello - Col Rodella cable car · Summer 2026
13 Jun - 11 Oct 2026
Hours: 8:30-17:30
Source: valdifassalift.it · checked on 23 September 2026
-
Canazei - Pecol - Col dei Rossi (Belvedere) · Summer 2026
13 Jun - 27 Sept 2026
Hours: 8:30-17:20
Source: valdifassalift.it · checked on 23 September 2026
-
Alba: Ciampac gondola and Col dei Rossi cable car · Summer 2026
13 Jun - 13 Sept 2026
Source: valdifassalift.it · checked on 23 September 2026
-
Roseal - Giumela chairlift · Summer 2026
13 Jun - 13 Sept 2026
Hours: 8:30-12:30 and 14:00-17:00
Source: valdifassalift.it · checked on 23 September 2026
-
Pozza - Buffaure gondola · Summer 2026
20 Jun - 30 Aug 2026
Hours: 8:30-17:50
Source: valdifassalift.it · checked on 23 September 2026
-
Pian Pecei - Ciampedie chairlift · Summer 2026
20 Jun - 13 Sept 2026
Hours vary over the season, longer in July and August.
Source: valdifassalift.it · checked on 23 September 2026
-
Vajolet 1 and 2 chairlifts (Catinaccio) · Summer 2026
20 Jun - 13 Sept 2026
Hours vary over the season, longer in July and August.
Source: valdifassalift.it · checked on 23 September 2026
-
Pian Pecei - Pra Martin chairlift · Summer 2026
27 Jun - 30 Aug 2026
Hours: 8:30-12:30 and 14:00-17:30
Source: valdifassalift.it · checked on 23 September 2026
-
Rodella - Des Alpes chairlift · Summer 2026
27 Jun - 20 Sept 2026
Hours: 9:00-17:15
Source: valdifassalift.it · checked on 23 September 2026
-
Pradel - Salei chairlift (Sella Pass) · Summer 2026
27 Jun - 20 Sept 2026
Hours: 9:00-17:00
Source: valdifassalift.it · checked on 23 September 2026
-
Belvedere - Col Rodella, Buffaure - Ciampac and Catinaccio ski areas · Winter 2026/27
Dates planned by the operator
4 Dec 2026 - 4 Apr 2027
Season window from the Dolomiti Superski data shown on fassa.com, identical for every ski area: not an announced opening date for this area. To be re-checked when the operator announces openings.
Source: fassa.com · checked on 23 September 2026
This is not live status: check the official site before you go up.
Technical data
Length 700 m · Vertical drop 212 m · Average gradient 30%
Chairlift Cima Uomo, Valley station 2,258 m, Top station 2,470 m, Length 700 m, Vertical drop 212 m, Average gradient 30%.
- Lift type
- Chairlift
- Length
- 700 m
- Vertical drop
- 212 m
- Valley station
- 2,258 m
- Top station
- 2,470 m
- Average gradient
- 30%
- Hourly capacity
- 1,790 p/h
- Seats per vehicle
- 4
- Ride time
- 5.3 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Val di Fassa
- Roseal - Giumela Chairlift · 2,424 m
- Orsa Maggiore Chairlift · 2,420 m
- Pecol - Col dei Rossi Cable car · 2,357 m
- FUF Alba - Col dei Rossi Cable car · 2,357 m
- Col de Valvacin Chairlift · 2,344 m
- Sella Brunech Chairlift · 2,336 m
- Pala del Gheiger Chairlift · 2,302 m
- Sasso di Rocca Drag lift · 2,294 m
Frequently asked questions
How long is Cima Uomo?
The line measures 700 m along the route mapped in OpenStreetMap, with 212 m of vertical drop.
How long is the ride on Cima Uomo?
The ride takes about 5.3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Cima Uomo cover?
Cima Uomo covers 212 m of vertical drop, from 2,258 m to 2,470 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Cima Uomo carry?
Declared capacity is 1,790 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Cima Uomo open?
Opening times follow the lift calendar of Val di Fassa: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Cima Uomo and how do you get there?
The valley station is in Val di Fassa, Trentino Alto Adige, at 2,258 m. The map on this page shows the starting point and the route up to 2,470 m. Car parks and bus stops differ from resort to resort: check the operator's website for current directions.