Vai al contenuto

Chairlift · Alagna Valsesia · Piemonte

Cimalegna-Passo Salati

Cimalegna-Passo Salati (chairlift) serves Alagna Valsesia, Piemonte. The line measures 1,706 m and covers 330 m of vertical drop. The base station is at 2,653 m. The top station is at 2,983 m. The ride takes about 6.4 minutes. Declared capacity is 2,000 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,706 m
Vertical drop
330 m
Top station
2,983 m
Hourly capacity
2,000 p/h

Photos

SemudobiaCC BY-SA 3.0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station2,653 mTop station2,983 m1,706 m330 m19%

Length 1,706 m · Vertical drop 330 m · Average gradient 19%

Chairlift Cimalegna-Passo Salati, Base station 2,653 m, Top station 2,983 m, Length 1,706 m, Vertical drop 330 m, Average gradient 19%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,706 m
Vertical drop
330 m
Base station
2,653 m
Top station
2,983 m
Average gradient
19%
Hourly capacity
2,000 p/h
Seats per vehicle
4
Ride time
6.4 min
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Alagna Valsesia

  • Funivia Passo dei Salati-Punta Indren Cable car · 3,264 m
  • Gabiet - Passo dei Salati Gondola · 2,993 m
  • Pianalunga - Cimalegna - Salati Cable car · 2,978 m
  • Pianalunga - Bocchetta Chairlift · 2,394 m
  • Gabiet - Lago Chairlift · 2,386 m
  • Alagna - Pianalunga Gondola · 2,053 m
  • Pianalunga Magic carpet · 2,044 m
  • Wold 2 Drag lift · 1,330 m

All lifts in Alagna Valsesia →

Frequently asked questions

How long is Cimalegna-Passo Salati?

The line measures 1,706 m along the route mapped in OpenStreetMap, with 330 m of vertical drop.

How long is the ride on Cimalegna-Passo Salati?

The ride takes about 6.4 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Cimalegna-Passo Salati cover?

Cimalegna-Passo Salati covers 330 m of vertical drop, from 2,653 m to 2,983 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Cimalegna-Passo Salati carry?

Declared capacity is 2,000 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Cimalegna-Passo Salati open?

Opening times follow the lift calendar of Alagna Valsesia: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Cimalegna-Passo Salati and how do you get there?

The base station is in Alagna Valsesia, Piemonte, at 2,653 m. The map on this page shows the starting point and the route up to 2,983 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.