Vai al contenuto

Chairlift · Madesimo · Lombardia

Colmenetta Est

In Madesimo, Lombardia, Colmenetta Est (chairlift) climbs from 1,858 m to 2,130 m over a line of 982 m, with 272 m of vertical drop. Each vehicle carries 4 people. Declared capacity reaches 2,400 people per hour. The ride takes about 4 minutes. The manufacturer is Agamatic. The lift entered service in 1999.

Length
982 m
Vertical drop
272 m
Top station
2,130 m
Hourly capacity
2,400 p/h

Technical data

Base station1,858 mTop station2,130 m982 m272 m28%

Length 982 m · Vertical drop 272 m · Average gradient 28%

Chairlift Colmenetta Est, Base station 1,858 m, Top station 2,130 m, Length 982 m, Vertical drop 272 m, Average gradient 28%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
982 m
Vertical drop
272 m
Base station
1,858 m
Top station
2,130 m
Average gradient
28%
Hourly capacity
2,400 p/h
Seats per vehicle
4
Ride time
4 min
Manufacturer
Agamatic
Year built
1999
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Season and opening times

open in summer
4 July 2026 - 6 September 2026

www.valtellina.it · 23 August 2026

Other lifts in Madesimo

  • Serenissima Chairlift · 2,200 m
  • Cima Sole Chairlift · 2,106 m
  • Lago Azzurro Chairlift · 1,950 m
  • Motta Chairlift · 1,949 m
  • Montalto Chairlift · 1,883 m
  • Baby Park Larici Magic carpet · 1,876 m
  • Larici Gondola · 1,865 m
  • Palù Chairlift · 1,759 m

All lifts in Madesimo →

Frequently asked questions

How long is Colmenetta Est?

The line measures 982 m along the route mapped in OpenStreetMap, with 272 m of vertical drop.

How long is the ride on Colmenetta Est?

The ride takes about 4 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Colmenetta Est cover?

Colmenetta Est covers 272 m of vertical drop, from 1,858 m to 2,130 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Colmenetta Est carry?

Declared capacity is 2,400 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Colmenetta Est and when?

The lift was built by Agamatic. It has been in service since 1999. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Colmenetta Est open?

Opening times follow the lift calendar of Madesimo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Colmenetta Est and how do you get there?

The base station is in Madesimo, Lombardia, at 1,858 m. The map on this page shows the starting point and the route up to 2,130 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.