Vai al contenuto

Chairlift · Prato Nevoso · Piemonte

F5 Monte Moro

F5 Monte Moro (chairlift) serves Prato Nevoso, Piemonte. The line measures 2,019 m and covers 745 m of vertical drop. The base station is at 898 m. The top station is at 1,643 m. The ride takes about 19 minutes. Declared capacity is 260 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
2,019 m
Vertical drop
745 m
Top station
1,643 m
Hourly capacity
260 p/h

Technical data

Base station898 mTop station1,643 m2,019 m745 m37%

Length 2,019 m · Vertical drop 745 m · Average gradient 37%

Chairlift F5 Monte Moro, Base station 898 m, Top station 1,643 m, Length 2,019 m, Vertical drop 745 m, Average gradient 37%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
2,019 m
Vertical drop
745 m
Base station
898 m
Top station
1,643 m
Average gradient
37%
Hourly capacity
260 p/h
Seats per vehicle
1
Ride time
19 min

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Prato Nevoso

  • Telecabina “La Rossa” Gondola · 1,916 m
  • Caudano Chairlift · 1,789 m
  • Vallone Drag lift · 1,734 m
  • Malanotte Chairlift · 1,733 m
  • Prel Chairlift · 1,730 m
  • La Nuova Blu Chairlift · 1,679 m
  • Blu Chairlift · 1,670 m
  • Cronista Drag lift · 1,602 m

All lifts in Prato Nevoso →

Frequently asked questions

How long is F5 Monte Moro?

The line measures 2,019 m along the route mapped in OpenStreetMap, with 745 m of vertical drop.

How long is the ride on F5 Monte Moro?

The ride takes about 19 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does F5 Monte Moro cover?

F5 Monte Moro covers 745 m of vertical drop, from 898 m to 1,643 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does F5 Monte Moro carry?

Declared capacity is 260 people per hour, with 1 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is F5 Monte Moro open?

Opening times follow the lift calendar of Prato Nevoso: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is F5 Monte Moro and how do you get there?

The base station is in Prato Nevoso, Piemonte, at 898 m. The map on this page shows the starting point and the route up to 1,643 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.