Chairlift · Madonna di Campiglio · Trentino Alto Adige
Miramonti
Miramonti (chairlift) serves Madonna di Campiglio, Trentino Alto Adige. The line measures 404 m and covers 171 m of vertical drop. The base station is at 1,565 m. The top station is at 1,736 m. The ride takes about 4.3 minutes. Declared capacity is 1,200 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 404 m
- Vertical drop
- 171 m
- Top station
- 1,736 m
- Hourly capacity
- 1,200 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 404 m · Vertical drop 171 m · Average gradient 42%
Chairlift Miramonti, Base station 1,565 m, Top station 1,736 m, Length 404 m, Vertical drop 171 m, Average gradient 42%.
- Lift type
- Chairlift
- Length
- 404 m
- Vertical drop
- 171 m
- Base station
- 1,565 m
- Top station
- 1,736 m
- Average gradient
- 42%
- Hourly capacity
- 1,200 p/h
- Seats per vehicle
- 2
- Ride time
- 4.3 min
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Season and opening times
- open in summer
- 18 June 2026 - 20 September 2026
www.ski.it · 24 August 2026
Other lifts in Madonna di Campiglio
- Grostè Chairlift · 2,496 m
- Grostè 2 express Gondola · 2,431 m
- Rododendro express Chairlift · 2,261 m
- Patascoss Chairlift · 2,151 m
- Genziana Express Chairlift · 2,149 m
- Pradalago Gondola · 2,120 m
- Pancugolo Chairlift · 2,114 m
- Fortini Express Gondola · 2,099 m
Frequently asked questions
How long is Miramonti?
The line measures 404 m along the route mapped in OpenStreetMap, with 171 m of vertical drop.
How long is the ride on Miramonti?
The ride takes about 4.3 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.
What vertical drop does Miramonti cover?
Miramonti covers 171 m of vertical drop, from 1,565 m to 1,736 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Miramonti carry?
Declared capacity is 1,200 people per hour, with 2 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Miramonti open?
Opening times follow the lift calendar of Madonna di Campiglio: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Miramonti and how do you get there?
The base station is in Madonna di Campiglio, Trentino Alto Adige, at 1,565 m. The map on this page shows the starting point and the route up to 1,736 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.