Vai al contenuto

Chairlift · Madesimo · Lombardia

Montalto

In Madesimo, Lombardia, Montalto (chairlift) climbs from 1,561 m to 1,883 m over a line of 1,075 m, with 322 m of vertical drop. Each vehicle carries 4 people. Declared capacity reaches 2,400 people per hour. The ride takes about 5 minutes. The manufacturer is Agamatic. The lift entered service in 1999.

Length
1,075 m
Vertical drop
322 m
Top station
1,883 m
Hourly capacity
2,400 p/h

Photos

User:Mateus2019CC BY 3.0 de · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,561 mTop station1,883 m1,075 m322 m30%

Length 1,075 m · Vertical drop 322 m · Average gradient 30%

Chairlift Montalto, Base station 1,561 m, Top station 1,883 m, Length 1,075 m, Vertical drop 322 m, Average gradient 30%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,075 m
Vertical drop
322 m
Base station
1,561 m
Top station
1,883 m
Average gradient
30%
Hourly capacity
2,400 p/h
Seats per vehicle
4
Ride time
5 min
Manufacturer
Agamatic
Year built
1999
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Season and opening times

open in summer
4 July 2026 - 6 September 2026

www.valtellina.it · 23 August 2026

Other lifts in Madesimo

  • Serenissima Chairlift · 2,200 m
  • Colmenetta Est Chairlift · 2,130 m
  • Cima Sole Chairlift · 2,106 m
  • Lago Azzurro Chairlift · 1,950 m
  • Motta Chairlift · 1,949 m
  • Baby Park Larici Magic carpet · 1,876 m
  • Larici Gondola · 1,865 m
  • Palù Chairlift · 1,759 m

All lifts in Madesimo →

Frequently asked questions

How long is Montalto?

The line measures 1,075 m along the route mapped in OpenStreetMap, with 322 m of vertical drop.

How long is the ride on Montalto?

The ride takes about 5 minutes at the declared operating speed. Strong wind or reduced speed makes it longer.

What vertical drop does Montalto cover?

Montalto covers 322 m of vertical drop, from 1,561 m to 1,883 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Montalto carry?

Declared capacity is 2,400 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Montalto and when?

The lift was built by Agamatic. It has been in service since 1999. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Montalto open?

Opening times follow the lift calendar of Madesimo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Montalto and how do you get there?

The base station is in Madesimo, Lombardia, at 1,561 m. The map on this page shows the starting point and the route up to 1,883 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.