Chairlift · Sappada · Veneto
Seggiovia Monte Siera
Seggiovia Monte Siera (chairlift) serves Sappada, Veneto. The line measures 1,138 m and covers 295 m of vertical drop. The base station is at 1,279 m. The top station is at 1,574 m. Declared capacity is 1,188 people per hour. Manufacturer and year built are not recorded in the open data we use.
- Length
- 1,138 m
- Vertical drop
- 295 m
- Top station
- 1,574 m
- Hourly capacity
- 1,188 p/h
Photos
Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.
Technical data
Length 1,138 m · Vertical drop 295 m · Average gradient 26%
Chairlift Seggiovia Monte Siera, Base station 1,279 m, Top station 1,574 m, Length 1,138 m, Vertical drop 295 m, Average gradient 26%.
- Lift type
- Chairlift
- Length
- 1,138 m
- Vertical drop
- 295 m
- Base station
- 1,279 m
- Top station
- 1,574 m
- Average gradient
- 26%
- Hourly capacity
- 1,188 p/h
- Seats per vehicle
- 2
Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction
Map and route
Weather at the top station
Other lifts in Sappada
- Seggiovia Hochbolt Chairlift · 1,845 m
- Seggiovia Miravalle Chairlift · 1,711 m
- Sciovia Creta Forata Drag lift · 1,648 m
- Seggiovia Pian dei Nidi Chairlift · 1,420 m
- Seggiovia Eiben Col dei Mughi Chairlift · 1,383 m
- Sciovia Sauris di Sotto Drag lift · 1,350 m
- Skilift Pradibosco Drag lift · 1,297 m
- Tappeto Taisa Magic carpet · 1,292 m
Frequently asked questions
How long is Seggiovia Monte Siera?
The line measures 1,138 m along the route mapped in OpenStreetMap, with 295 m of vertical drop.
What vertical drop does Seggiovia Monte Siera cover?
Seggiovia Monte Siera covers 295 m of vertical drop, from 1,279 m to 1,574 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.
How many people per hour does Seggiovia Monte Siera carry?
Declared capacity is 1,188 people per hour, with 2 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.
When is Seggiovia Monte Siera open?
Opening times follow the lift calendar of Sappada: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.
Where is Seggiovia Monte Siera and how do you get there?
The base station is in Sappada, Veneto, at 1,279 m. The map on this page shows the starting point and the route up to 1,574 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.