Vai al contenuto

Chairlift · Racines-Giovo · Trentino Alto Adige

Saxner

Saxner (chairlift) serves Racines-Giovo, Trentino Alto Adige. The line measures 1,224 m and covers 338 m of vertical drop. The base station is at 1,798 m. The top station is at 2,136 m. Declared capacity is 2,200 people per hour. Manufacturer and year built are not recorded in the open data we use.

Length
1,224 m
Vertical drop
338 m
Top station
2,136 m
Hourly capacity
2,200 p/h

Photos

JensibuaCC0 · Wikimedia Commons

Photos published under a free licence by Wikimedia Commons, geolocated within 500 metres of the lift.

Technical data

Base station1,798 mTop station2,136 m1,224 m338 m28%

Length 1,224 m · Vertical drop 338 m · Average gradient 28%

Chairlift Saxner, Base station 1,798 m, Top station 2,136 m, Length 1,224 m, Vertical drop 338 m, Average gradient 28%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Chairlift
Length
1,224 m
Vertical drop
338 m
Base station
1,798 m
Top station
2,136 m
Average gradient
28%
Hourly capacity
2,200 p/h
Seats per vehicle
6
  • Bubble cover

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Racines-Giovo

  • 6CLD/8MGD Panorama Hybrid lift · 2,140 m
  • Malga Rinner Chairlift · 2,087 m
  • Enzian Chairlift · 2,062 m
  • Malga Calice Chairlift · 1,995 m
  • Stock Chairlift · 1,969 m
  • Wastenegg Chairlift · 1,966 m
  • Wasserfalleralm Chairlift · 1,879 m
  • Rosskopf Gondola · 1,850 m

All lifts in Racines-Giovo →

Frequently asked questions

How long is Saxner?

The line measures 1,224 m along the route mapped in OpenStreetMap, with 338 m of vertical drop.

What vertical drop does Saxner cover?

Saxner covers 338 m of vertical drop, from 1,798 m to 2,136 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Saxner carry?

Declared capacity is 2,200 people per hour, with 6 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

When is Saxner open?

Opening times follow the lift calendar of Racines-Giovo: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Saxner and how do you get there?

The base station is in Racines-Giovo, Trentino Alto Adige, at 1,798 m. The map on this page shows the starting point and the route up to 2,136 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.